' STREET LIGHT CONSTRUCTION NOTICE <br /> AGENCY: EWER DRAWING <br /> EWER MAP E-21N <br /> DATE: December 14, 2005 <br /> City of Eugene-PWM (Maintenance) <br /> City of Eugene-PWE (Capital& PEPI) X <br /> Please disconnect existing service wires at new secondary vault on the N.E. corner of the intersection and <br /> connect new service wires. <br /> ~ Coordinate with contractor (Lantz Electric 726-0659). <br /> Add one 200W HPS st. Its <br /> ~I <br /> EWEB CONSTRUCTION PLANS <br /> ' EmX Franklin Project # 4332 -Service at Franklin and Riverfront Parkway/Agate <br /> St. <br /> Developer's Name: Lane Transit District Eugene Water & Electric Board <br /> Telephone #:501-2118 Larry Lindley <br /> COE Rep's Name: Randal Dale Prepared By: Jerry Brule <br /> Telephone 682-4961 Telephone 682-5522 <br /> PO GJN <br /> ~ #:4332 <br /> REPLY <br /> Eugene Water & Electric Board <br /> Attention: Debbie Crampton +$6.10 <br /> Electric Distribution Supervisor <br /> 1. Connect (1-200W) high pressure sodium street lights as per attached drawing and bill <br /> $(6.10)/month as per EWEB J-4 street light schedule. <br /> i, Preliminary billing is as follows: <br /> EWEB to bill LTD for the following work: <br /> Ditch: S <br /> Duct: $ <br /> I' Other: $ <br /> Transfer: $ <br /> New Installation: (Disconnect and connect in same box) $ 67.00 <br /> ~ Total: $ 67.00 <br /> i <br /> Agency: C' of gene Eugene Water & Electric Board <br /> Authorized by: i~ By: <br /> <br /> ~„r <br /> B-15-03 <br /> <br />