New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4332 Streetlight Construction Notice
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4332 Streetlight Construction Notice
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 3:15:17 PM
Creation date
7/9/2008 3:54:56 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
004332
GL_Project_Number
374332
Retention_Destruction_Date
9/20/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ <br /> STREET LIGHT CONSTRUCTION NOTICE ~J <br /> AGENCY: EWEB DRAWING <br /> EWEB MAP E-21N <br /> DATE: December 14, 2005 <br /> City of Eugene-PWM (Maintenance) <br /> City of Eugene-PWE (Capital& PEPI) _X <br /> Please disconnect existing service wires at new secondary vault on the N.E. corner of the intersection and <br /> connect new service wires. <br /> ~ Coordinate with contractor (Lantz Electric 726-0659). <br /> Remove five 200W HPS street lights and one 400W HPS street light (signal), and add six 200W HPS st. <br /> Its <br /> ~ EWEB CONSTRUCTION PLANS <br /> j EmX Franklin Project # 4332 -Service at Franklin and Onyx <br /> ~ Developer's Name: Lane Transit District Eugene Water & Electric Board <br /> Telephone #:501-2118 Larry Lindley <br /> COE Rep's Name: Randal Dale Prepared By: Jerry Brule <br /> Telephone 682-4961 Telephone 682-5522 <br /> PO GJN <br /> #:4332 <br /> REPLY <br /> Eugene Water & Electric Board <br /> Attention: Debbie Crampton (+$6.10 - $ 10.25 = 4.15) <br /> Electric Distribution Supervisor <br /> 1. Connect (6-200W and remove 5-200W and 1-400W) high pressure sodium street lights as per <br /> attached drawing and credit $(4.15)/month as per EWER J-4 street light schedule. <br /> Preliminary billing is as follows: <br /> i <br /> ~ EWEB to bill LTD for the following work: <br /> Ditch: $ <br /> Duct: $ <br /> Other: $ <br /> J Transfer: $ <br /> New Installation: (Disconnect and connect in same box) $ 67.00 <br /> Total: $ 67.00 <br /> Agency: of ugene Eugene Water & Electric Board <br /> Authorized by: By: <br /> <br /> f <br /> 8-T5-03 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.