Run Date: 04/22/2008 09:03:48 City of Eugene <br /> Estimate Pribution <br /> Estimate: Eng.. er's Estimate #1 <br /> Job 93-004536 AUTZEN PATH LIGHTING IMPROVSMSNT3 <br /> Line No. Description Quantity Unit Unit Price Amount ' <br /> AUTZBN PATH LIGHTING IMPROVEMENTS <br /> General <br /> 0010. MOBILIZATION 1.00 LUMPSUM $5,000.00 $5,000.00 <br /> 0020. TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE 1.00 LUMPSUM $1,200.00 $1,200.00 <br /> 0030. EROSION CONTROL 1.00 LUMPSUM $1,000.00 $1,000.00 <br /> 0040. TREE PROTECTION FENCING 800.00 FOOT $1.50 $1,200.00 <br /> 0050. SENSITIVE ROOT ZONE EXCAVATION 25.00 FOOT $75.00 $1,875.00 <br /> 0060. TRENCH, CONDUIT, GROUND RODS, WIRING COMPLETE 1.00 LUMPSUM $5,000.00 $5,000.00 <br /> 0070. INSTALL (CITY PROVIDED) JUNCTION BOX 24.00 EACH $100.00 $2,400.00 <br /> 0080. INSTALL PEDESTRIAN SCALE LIGHTING FOOTING 24.00 EACH $500.00 $12,000.00 <br /> 0090. INSTALL LIGHT POLE SLAB 24.00 EACH $275.00 $6,600.00 <br /> 0100. INSTALL (CITY PROVIDED) PEDESTRIAN SCALE LIGH 24.00 EACH $250.00 $6,000.00 <br /> 0110. REMOVE AND REINSTALL EXISTING SIGNS 1.00 LUMPSUM $100.00 $100.00 <br /> 0120. REMOVAL OF EXISTING ILLUMINATION 1.00 LUMPSUM $2,500.00 $2,500.00 <br /> 0130. REMOVE, STRAIGHTEN, REINSTALL POLE BRACKET 1.00 EACH $3,500.00 $3,500.00 <br /> Total General $48,375.00 <br /> Total AUTZEN PATH LIGHTING IMPROVEMENTS $48,375.00 <br /> AUTZEN PATH LIGHTING IMPROVEMENTS - Miscellaneous <br /> General <br /> street lights 1.00 LUMPSUM $61,404.00 $61,404.00 <br /> CITY ELECTRICIAN 1.00 LUMPSUM $6,000.00 $6,000.00 <br /> Advertising 1.00 LUMPSUM $500.00 $500.00 <br /> Engineering Charge 1.00 LUMPSUM $30,000.00 $30,000.00 <br /> Permits 1.00 LUMPSUM $500.00 $500.00 <br /> CONTINGENCY 20~ of Direct $9,675.00 <br /> Printing 1.00 LUMPSUM $150.00 $150.00 <br /> AS-CONST. 11MONTH WARRANTY CHARGE 1.00 LUMPSUM $1,000.00 $1,000.00 <br /> Total General $109,229.00 <br /> Total AUTZSN PATH LIGHTING IMPROVEMENTS - Miscellaneous $99,554.00 <br /> <br /> Total Engineer's Estimate #1 $147,929.00 <br /> <br />