Run Date: 04/22/2008 11:09:47 City of Eugene <br /> Estimate I`ibution <br /> Estimate: Post id Estimate <br /> Job 93-004536 AUTZSN PATH LIGHTING IMPROVB~QEN'PS <br /> Line No. Description Quantity Unit Unit Price Amount <br /> AUTZSN PATH LIGHTING IMPROVSMENTS <br /> General <br /> 0010. MOBILIZATION 1.00 LUMPSUM $2,400.00 $2,400.00 <br /> 0020. TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE 1.00 LUMPSUM $2,023.00 $2,023.00 <br /> 0030. EROSION CONTROL 1.00 LUMPSUM $1,120.00 $1,120.00 <br /> 0040. TREE PROTECTION FENCING 800.00 FOOT $1.00 $800.00 <br /> 0050. SENSITIVE ROOT ZONE EXCAVATION 25.00 FOOT $15.00 $375.00 <br /> 0060. TRENCH, CONDUIT, GROUND RODS, WIRING COMPLETE 1.00 LUMPSUM $9,570.00 $9,570.00 <br /> 0070. INSTALL (CITY PROVIDED) JUNCTION BOX 24.00 EACH $75.00 $1,800.00 <br /> 0080. INSTALL PEDESTRIAN SCALE LIGHTING FOOTING 24.00 EACH $700.00 $16,800.00 <br /> 0090. INSTALL LIGHT POLE SLAB 24.00 EACH $175.00 $4,200.00 <br /> 0100. INSTALL (CITY PROVIDED) PEDESTRIAN SCALE LIGH 24.00 EACH $150.00 $3,600.00 <br /> 0110. REMOVE AND REINSTALL EXISTING SIGNS 1.00 LUMPSUM $150.00 $150.00 <br /> 0120. REMOVAL OF EXISTING ILLUMINATION 1.00 LUMPSUM $1,500.00 $1,500.00 <br /> 0130. REMOVE, STRAIGHTEN, REINSTALL POLE BRACKET 1.00 EACH $2,150.00 $2,150.00 <br /> Total General $46,488.00 <br /> Total AUTZEN PATH LIGHTING IMPROVBblSNT3 $46,488.00 <br /> AUTZSTT PATH LIGHTING IMPROV~NTS - Miscellaneous <br /> General . <br /> street lights 1.00 LUMPSUM $61,404.00 $61,404.00 <br /> CITY ELECTRICIAN 1.00 LUMPSUM $6,000.00 $6,000.00 <br /> Advertising 1.00 LUMPSUM $500.00 $500.00 <br /> Engineering Charge 1.00 LUMPSUM $30,000.00 $30,000.00 <br /> Permits 1.00 LUMPSUM $500.00 $500.00 <br /> CONTINGENCY 10~ of Direct $4,648.80 <br /> Printing 1.00 LUMPSUM $150.00 $150.00 <br /> AS-CONST. 11MONTH WARRANTY CHARGE 1.00 LUMPSUM $1,000.00 $1,000.00 <br /> Total General $104,202.80 <br /> Total AUTZSN PATH LIGHTING IMPROVEMENTS - Miscellaneous $99,554.00 <br /> <br /> Total Post Bid Estimate $146,042.00 <br /> <br />