_ <br /> Table 1: Current Project Status and Budget Information for the Lower Amazon LOMB Study <br /> TASK Project Status/ Remaining Work Status of Bud et <br /> Work Completed Original Budget Budget <br /> Budget Spent Remaining <br /> (as of (as of <br /> 7/6/01 7/6/01 <br /> 3. Hydraulic 1. URS has updated the existing 1. URS will modify the updated UNET $21,300 $ 21,390 -$90 <br /> A~Y~ UNET model by the Corps for the model to incorporate the bike pass and <br /> Diversion Channel and A Channel pedestrian bridge in the 113 project <br /> downstream of Royal based on area. <br /> new survey data and updated 2. IIRS will use HEC-RAS program to <br /> topographic information, perform the floodplain and floodway <br /> 2• URS has concluded the Diversion analyses for the A Channel and the <br /> Channel is unlikely to provide Diversion Channel, and the Greenhill <br /> protection for the 100-year storm Tributary downstream of 1135 project. <br /> 3. URS will perform four difference levee <br /> scenarios for the Diversion Channel <br /> levee to define the BFEs for the <br /> Diversion Channel. <br /> 4. Floodplain The work has not yet been initiated for 1. URS will identify the 100-yeaz $8,200 $0 $8,200 <br /> and Floodway this task. floodplain and floodway for the Lower <br /> Identification Amazon Creek on hazd copies of the <br /> study area. <br /> 2. URS will check the feasibility of <br /> submitting digital floodplain maps to <br /> FEMA. <br /> <br /> I:945042~Amazon FEMAlcontractaddendumtablel.doc 07/IO/O1 <br /> 2 <br /> <br />