New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3890 URS Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3890 URS Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2011 10:04:43 AM
Creation date
7/8/2008 9:42:07 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
003890
GL_Project_Number
905116
Identification_Number
2000025268
COE_Contract_Number
0739-791-9971
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ . <br /> _ <br /> ~'ab~e C~irr~~lt Project Status andBudget In~olmation for the Lower Amazon LOMB Study <br /> TASK Project Status/ Remaining Work Status of Bud et <br /> Work Completed Original Budget Budget <br /> Budget Spent Remaining <br /> (as of (as of <br /> 7/6/01 7/6/01) <br /> 1. Data 1. URS obtained the hydrologic and 1. URS will collect final design $2,390 $8,600 -$6,150 <br /> Collection hydraulic information from the information for the Greenhill Tributary i <br /> FEMA library. from the City. <br /> 2. URS obtained new survey data and 2. URS will collect final design <br /> topographic information for information for the proposed bike pass <br /> portions of the Lower Amazon and pedestrian bridges in the 1135 <br /> Creek from the City. project area from the City. <br /> 3. URS obtained electronic as-built 3. URS will work with the City and the <br /> information for the 1135 project Corps to make sure that the bike pass <br /> from the Corps. design meets the Corp's requirements <br /> with respect to levee certification. <br /> 2. Hydrologic 1. URS has obtained the peak 1. URS will make the conversion from XP- $6,350 $7,720 -$1,370 <br /> Analysis information for the Amazon Creek SWMM to EPA SWMM model for the <br /> from the existing Flood Insurance Greenhill Tributary. <br /> Study. <br /> 2. URS has modified the HEC-1 <br /> model developed by the Corps for <br /> the 1135 project and generate flow <br /> hydrographs for the UNET model. <br /> 3. URS has started converting the <br /> XP-SWMM model to EPA <br /> SWMM model for the Greenhill <br /> Tributary. <br /> <br /> I:945042°d\Amazon FEMA\contractaddendumtablel.doc 07/10/01 1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.