~ . <br /> _ <br /> ~'ab~e C~irr~~lt Project Status andBudget In~olmation for the Lower Amazon LOMB Study <br /> TASK Project Status/ Remaining Work Status of Bud et <br /> Work Completed Original Budget Budget <br /> Budget Spent Remaining <br /> (as of (as of <br /> 7/6/01 7/6/01) <br /> 1. Data 1. URS obtained the hydrologic and 1. URS will collect final design $2,390 $8,600 -$6,150 <br /> Collection hydraulic information from the information for the Greenhill Tributary i <br /> FEMA library. from the City. <br /> 2. URS obtained new survey data and 2. URS will collect final design <br /> topographic information for information for the proposed bike pass <br /> portions of the Lower Amazon and pedestrian bridges in the 1135 <br /> Creek from the City. project area from the City. <br /> 3. URS obtained electronic as-built 3. URS will work with the City and the <br /> information for the 1135 project Corps to make sure that the bike pass <br /> from the Corps. design meets the Corp's requirements <br /> with respect to levee certification. <br /> 2. Hydrologic 1. URS has obtained the peak 1. URS will make the conversion from XP- $6,350 $7,720 -$1,370 <br /> Analysis information for the Amazon Creek SWMM to EPA SWMM model for the <br /> from the existing Flood Insurance Greenhill Tributary. <br /> Study. <br /> 2. URS has modified the HEC-1 <br /> model developed by the Corps for <br /> the 1135 project and generate flow <br /> hydrographs for the UNET model. <br /> 3. URS has started converting the <br /> XP-SWMM model to EPA <br /> SWMM model for the Greenhill <br /> Tributary. <br /> <br /> I:945042°d\Amazon FEMA\contractaddendumtablel.doc 07/10/01 1 <br /> <br />