CITY OF EUGENE <br />DEPARTMENT OF PUBLIC WORKS <br />ENGINEERING DIVISION <br /> <br /> <br /> <br />Change Order <br />CONTRACTOR: Delta Constnwtion Co. <br />(ADDRESS) 999 Division Avenue <br />Eugene OR 97404 <br />PROJECT: Paving, verbs, gutlera, sidewalks, street lights, water quality blaswales, <br />and stormwater dreinage on River Avenue from Z00' east or River Road to <br />100' weal of Beldine Highway <br />You are directed to make the following changes in this contract: <br />r-~n+.s~t <br />r~nr~r <br />Job # 3693 <br />Contract # 2007-02 <br />CharrgeOrder# 4 <br />Date: 07!17!07 <br />CAMS Dele: <br />Reviewed by. Date: <br />lnspedor. Ra Re <br />Const, Mgr. Kris Olson __ <br />Proj. Mgr. Joe Ramirez <br />Prindpal Eng. Michelle Cahill <br />Rem <br />No. Rem Time <br />Change Quantity <br />(Units Unlt <br />Cost <br />Amount <br />(+/-) Amended <br />Change Net <br />Chan e <br />171 Restock Stormwatar ADS Pipe 0.00 .W .DD x.00 <br /> Revised 0.00 .00 .00 <br /> Amended 1.00 L.S. 705.77 70s.77 ;705.77 <br />231 72- Stormweter Sedimente4on final 0.00 .00 .00 ;0.00 <br /> Manhole #81299 Revised 0.00 ,00 .00 <br /> Amended 1.00 tS ;3 322.00 ;3322.00 3 22.00 <br />261 AddlOorrel Stortnweter Connedians end Pipe Ori Ina! 0.00 .00 0.00 ;0.00 <br /> Revised 0.00 .00 .00 <br /> Amended 3.00 FA 600.00 1800.00 ;1800.00 <br /> Ori Ina! 0.00 .00 .00 ;0.00 <br /> Revised 0.00 ,00 .00 <br /> Amended .00 ;0.00 <br /> 'nal 0.00 0.00 0.00 x.00 <br /> Revised 0.00 .00 .00 <br /> Amended ;0.00 .00 <br /> +nal o.oo .oo .oo ;o.oo <br /> lilvlSed o.00 .oo .oo <br /> Amended .oo .~ <br />The original contract work days are 0.0 da <br />The contract time change this C.O o.o da <br />The contract time change by previous C.O.'s t5.0 da <br />The new contract work da are ts.o da <br />The original contract sum was <br />Net change by previous change order <br />Net change due to amendment by previous change order <br />The contract sum prior to this change order was <br />This change order will change contract sum by this amount <br />_..__._ ................._._._____...._._._..._____.__...__.___.._.._.._m_ <br />The new contrarx net change sum <br />The new Contract amendment sum <br />........_............._._......_..._....._._.__.m...__...~ .................__..._..._.._.._..........._..____._....__.._..._. <br />The new contract sum including this change order will be <br />Percents a of on final contract <br />NET CHANGE DUE TO AMENDMENTS -.-____..._ ................____..........._..._.............._.__.~._......_.........____..._ <br />Apptoval by: <br />City I ~~[G Prime Contractor <br />~1(~In~ <br />Dat- e r Date <br />CONTRACTOR ~ OFFICE FILE ~ PURCHASINGlCRO <br />E1,633,932.99 <br />E0.o0 <br />548,602.80 <br />51,882535.79 <br />55.827.77 <br />So.oo <br />554,430.57 <br />51.688,363.56 <br />3.33% <br />3.33% <br />Third Party <br />Date <br />OtFORMSiPROJECTCONSNtEVISED CHANGE ORDER.XLS <br />This changes the bid items as follows: <br />