CITY OF EUGENE <br />DEPARTMENT OF PUBLIC WORKS <br />ENGINEERING DIVISION <br />Change Order <br />CONTRACTOR: Delta Construc0on Co. <br />(ADDRESS) 999 Division Avenue <br />Eugene OR 97404 <br />PROJECT: Pavlnp curbs gutters sidewalks street lights, water quality bloswales, <br />and stonnwater drainage on River Avenue from 200' east or River Raad to <br />100' west of Beltline Htghwav <br />You are directed to make the following changes in this contract: <br />Contract <br />~..~ Cnn4rac4 <br />ItemM~~' <br />No. Item Tlme <br />Chan a Cuantity <br />Units Unit <br />Cost <br />Amount <br />+t-) Amended <br />Chan a Net <br />Change <br />171 Restock Stormwater ADS Pipe Od Inal 0.00 0.00 .00 ;0•~ <br /> Revised 0.00 0.00 0.00 <br /> Amended 1.00 L.S. 705.77 705.77 705.77 <br />231 72" Stormwater Sedimente0on Ort anal 0.00 0.00 0.00 ;0.00 <br /> Manhole 161299 Revised 0.00 0.00 0.00 <br /> Amended 1.00 LS 322.00 ;3 322.00 3 322.00 <br />261 Additional Stonnwater Connections and Pipe Ori Inal 0.00 0.00 0.00 #0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 3.00 FA 600.00 1800.00 ;1800.00 <br /> Ori Inal 0.00 0.00 0.00 ;0.00 <br /> Revised 0.00 0.00 O.OD <br /> Amended 50.00 ;0.00 <br /> Od Inal 0.00 0.00 0.00 ;0.00 <br /> Revised 0.00 0.00 0.00 <br /> Amended 0.00 0.00 <br /> Ori Inal 0.00 0.00 .00 ;0.00 <br /> Revised 0.00 .00 0.00 <br /> Amended 50.00 0.00 <br />The original contract work days are o.o da a <br />The contract time change this C.O 0.0 da a <br />The contract time change by previous C.0's 15.0 da <br />The new contract work da s are 15.0 da <br />The original contract sum was _ ..................__..._._.............._.._._.-._..................__.__.._......................._.....___---~...__....,........ <br />Net change by previous change order ~_.___..__ ..........................__._..__._._.__......_..._....._....__._.____.._......._..._.... <br />Net change due to amendment by previous change order •,•..•.•.,... „____-,._„.____--•-____,,,,_,-____,,,,,~,,,-_~_._... <br />The contract sum prior to this change order was ______.._. ...................__..__....._........___._._-•---..__...__...........__.._..._._....... <br />This change order will change contract sum by this amount -„_„-_.,,_,,,,,,,,,,,,,,,,,,,______-_..__.~.._..__..._....._..__...._.._._..._... <br />The new contract net change sum ._,._-._,._,..__„ ...............__._....__..._.._._...............__._~_...__......__ <br />The new contract amendment sum <br />........._...__....._........_ ..................__..___..._.w._.................._........_....._...__.........._....~.____...____. <br />The new contract sum including this change order will be ,,,,,,,,,,,_„__._,,.,,,.,,_,,,,,,,,,,,,,,,,,,,_,,..,.,.,..._,,,.._..,,._,._.........._.........___. <br />Percents a of orl anal contract ___,.,.___. ....._...._.._.__..__._...__........_.._.__._____........_._~..._.__. <br />NET CHANGE DUE TO AMENDMENTS <br />Appfoval by: <br />~~l~p MJ.I~/L- ~[ Ci <br />Ciry t er <br />~l~la~ <br />Date ~- <br />CONTRACTOR ~ OFFICE FILE <br />Prime Contractor <br />Date <br />PURCHASING/CRO <br />Job # 3693 <br />ContraG # 2007-02 <br />ChengeQrder# 4 <br />Dale: 07/t7l07 <br />CAMS Dete: <br />Reviewed by: Date: <br />Inspector: Remmers <br />Const Mar Kna Olson _ <br />Prof Mgr Joe Ramirez <br />Pdndpal Eng. Michelle Cahil ~- <br />51,633,932.99 <br />So.oo , I <br />.BO ~a I~1~~1~`1 <br />~ ~ SS827.77 ~ I'\t.$ t~q~.7.?9 <br />50.00 <br />5~4;d3637 .~,~G 2.5 7 <br />3.33% <br />r~ 3.33Wo <br />Third Party <br />Date <br />O\FORMS\PROJECT\CONST\REVISED CHANGE ORDER.XLS <br />This changes the bid items as follows: <br />