CITY OF EUGENE
<br />DEPARTMENT OF PUBLIC WORKS
<br />ENGINEERING DIVISION
<br />Change Order
<br />CONTRACTOR: Delta Construc0on Co.
<br />(ADDRESS) 999 Division Avenue
<br />Eugene OR 97404
<br />PROJECT: Pavlnp curbs gutters sidewalks street lights, water quality bloswales,
<br />and stonnwater drainage on River Avenue from 200' east or River Raad to
<br />100' west of Beltline Htghwav
<br />You are directed to make the following changes in this contract:
<br />Contract
<br />~..~ Cnn4rac4
<br />ItemM~~'
<br />No. Item Tlme
<br />Chan a Cuantity
<br />Units Unit
<br />Cost
<br />Amount
<br />+t-) Amended
<br />Chan a Net
<br />Change
<br />171 Restock Stormwater ADS Pipe Od Inal 0.00 0.00 .00 ;0•~
<br /> Revised 0.00 0.00 0.00
<br /> Amended 1.00 L.S. 705.77 705.77 705.77
<br />231 72" Stormwater Sedimente0on Ort anal 0.00 0.00 0.00 ;0.00
<br /> Manhole 161299 Revised 0.00 0.00 0.00
<br /> Amended 1.00 LS 322.00 ;3 322.00 3 322.00
<br />261 Additional Stonnwater Connections and Pipe Ori Inal 0.00 0.00 0.00 #0.00
<br /> Revised 0.00 0.00 0.00
<br /> Amended 3.00 FA 600.00 1800.00 ;1800.00
<br /> Ori Inal 0.00 0.00 0.00 ;0.00
<br /> Revised 0.00 0.00 O.OD
<br /> Amended 50.00 ;0.00
<br /> Od Inal 0.00 0.00 0.00 ;0.00
<br /> Revised 0.00 0.00 0.00
<br /> Amended 0.00 0.00
<br /> Ori Inal 0.00 0.00 .00 ;0.00
<br /> Revised 0.00 .00 0.00
<br /> Amended 50.00 0.00
<br />The original contract work days are o.o da a
<br />The contract time change this C.O 0.0 da a
<br />The contract time change by previous C.0's 15.0 da
<br />The new contract work da s are 15.0 da
<br />The original contract sum was _ ..................__..._._.............._.._._.-._..................__.__.._......................._.....___---~...__....,........
<br />Net change by previous change order ~_.___..__ ..........................__._..__._._.__......_..._....._....__._.____.._......._..._....
<br />Net change due to amendment by previous change order •,•..•.•.,... „____-,._„.____--•-____,,,,_,-____,,,,,~,,,-_~_._...
<br />The contract sum prior to this change order was ______.._. ...................__..__....._........___._._-•---..__...__...........__.._..._._.......
<br />This change order will change contract sum by this amount -„_„-_.,,_,,,,,,,,,,,,,,,,,,,______-_..__.~.._..__..._....._..__...._.._._..._...
<br />The new contract net change sum ._,._-._,._,..__„ ...............__._....__..._.._._...............__._~_...__......__
<br />The new contract amendment sum
<br />........._...__....._........_ ..................__..___..._.w._.................._........_....._...__.........._....~.____...____.
<br />The new contract sum including this change order will be ,,,,,,,,,,,_„__._,,.,,,.,,_,,,,,,,,,,,,,,,,,,,_,,..,.,.,..._,,,.._..,,._,._.........._.........___.
<br />Percents a of orl anal contract ___,.,.___. ....._...._.._.__..__._...__........_.._.__._____........_._~..._.__.
<br />NET CHANGE DUE TO AMENDMENTS
<br />Appfoval by:
<br />~~l~p MJ.I~/L- ~[ Ci
<br />Ciry t er
<br />~l~la~
<br />Date ~-
<br />CONTRACTOR ~ OFFICE FILE
<br />Prime Contractor
<br />Date
<br />PURCHASING/CRO
<br />Job # 3693
<br />ContraG # 2007-02
<br />ChengeQrder# 4
<br />Dale: 07/t7l07
<br />CAMS Dete:
<br />Reviewed by: Date:
<br />Inspector: Remmers
<br />Const Mar Kna Olson _
<br />Prof Mgr Joe Ramirez
<br />Pdndpal Eng. Michelle Cahil ~-
<br />51,633,932.99
<br />So.oo , I
<br />.BO ~a I~1~~1~`1
<br />~ ~ SS827.77 ~ I'\t.$ t~q~.7.?9
<br />50.00
<br />5~4;d3637 .~,~G 2.5 7
<br />3.33%
<br />r~ 3.33Wo
<br />Third Party
<br />Date
<br />O\FORMS\PROJECT\CONST\REVISED CHANGE ORDER.XLS
<br />This changes the bid items as follows:
<br />
|