y00d MON 09:21 FA% 591 882 80J0 CITY EUGENE PW ENG 0002/003 <br />Public Works <br />Engineering <br />City of Eugene <br />244 East Broadway <br />Eugene, Oregon 97401 <br />ADDENDUM N0.1 (541) fi82.556D <br />(b41) 682-8410 Fax <br />TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS FOR <br />TREE REMOVAL ON PORTIONS OF RIVER AVENUE FROM 200 FEET EAST OF RIVER ROAD TO 150 <br />FEET WEST OF BELTLINE HIGHWAY <br />MAY 10, 2004 JOB #3693 <br />TO ALL PLANHOLDERS: <br />QUOTE NUMBER 7 <br />The folbwing changes shall amend and supplement the project quoting documents only to the extent <br />specifically shown and noted. All other conditions shall remain the same. <br />quoters shall incorporate the effects of these changes in the appropriate quote items included in this <br />addendum and the total of these Quote items then add in the appropriate place on the quote form. <br />CHANGES TO THE PROPOSAL: <br />(DELETE} Original Page 1 of 3 an Proposal <br />(ADD} Revised Page 1 of 3 on Proposal dated (May 10, 2004) <br />The only Change on the proposal page is the project completion time changed from 20 <br />calendar days to 25 calendar days. <br />If you have questions about this addendum or the project, please call Joe Ramirez at (541) 682-5228- <br />All quoters shall acknowledge the receipt of and acceptance of this Addendum No. 1 by signing and <br />submitting the signed Addendum with the quote. Quotes submitted without this Addendum, or with the <br />Addendum not signed, will be considered informal. <br />~Ma k S oening, P. . <br />City Engineer <br />Receipt acknowledged and conditions agreed <br />this IZ day of ~~ 2004. <br />1 cs <br />Quotes 0.~~ ~.: ~ ~ Q ~ ~ `~ <br />Addendum #1 -Job #3933 Page 1 <br />