New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3693 E-mail 06.28.04
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3693 E-mail 06.28.04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2010 2:20:56 PM
Creation date
7/7/2008 1:56:06 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Correspondence
PW_Active
No
External_View
No
GJN
003693
GL_Project_Number
915014
Retention_Destruction_Date
5/1/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
STRUCTURAL STORM WATER TREATMENT SYSTEM <br />PART 1.00 GENERAL <br />1.01 DESCRIPTION <br />A. Work included: <br />The Contractor, and/or a manufacturer selected by and approved by the <br />Engineer, shall furnish all labor, commodity materials, equipment and <br />incidentals required and in accordance with the drawings and these <br />specifications. <br />B. Related work described elsewhere: <br />1. Unit Masonry <br />2. Miscellaneous Materials <br />3. Water Tight Joints <br />1.02 QUALITY CONTROL INSPECTION <br />A. The structural stormwater treatment system shall be dry fitted in the <br />manufacture's yard prior to shipment to the delivery site. The unit, when dry <br />fitted, shall have all component connections pre-drilled and anchored. Section <br />joints shall be clearly marked for the contractor to properly install and align <br />unit in field. <br />B. The quality of materials, the process of manufacture, and the finished <br />sections shall be subject to inspection by the Engineer. Such inspection may <br />be made at the place of manufacture, or on the work site after delivery, or at <br />both places. Sections rejected after delivery to the site shall be marked for <br />identification and shall be removed from the site at once. All sections, which <br />have been damaged after delivery will be rejected and, if already installed, <br />shall be acceptably repaired, if permitted, or removed and replaced, entirely <br />at the Contractor's expense. <br />C. All sections shall be inspected for general appearance, dimensions, <br />soundness, etc. The surface shall be dense, close textured and free of <br />blisters, cracks, roughness and exposure of reinforcement. <br />D. Imperfections may be repaired, subject to the acceptance of the Engineer. <br />Repairs shall be carefully inspected before final acceptance. <br />C:\Documents and Settings\cewaddc\Local Settings\Temporary Internet <br />Files\OLKDB\FINALWATERQUALITY.doc PAGE 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.