New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2008-05415OWEBcontract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
2008-05415OWEBcontract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2008 9:06:06 AM
Creation date
7/2/2008 4:35:46 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004572
COE_Contract_Number
2008-05415
GL_Grant
340
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
208-9~ 1-68 ~9 <br />~regon 150 - Wiilamette River Side Channel Habitat Enhancemen~ at Delta Ponds <br />EXHIBIT D <br />P~ST-IMPLEMENTATI~N STATUS REPaRT REQUIREMENT~ <br />~regon Administrat~ve Rule ~95-~ ~~-~ 10~~2} states ~hat "Grantee will monitor the long-term <br />effect~veness of the p~ojec~, and continue i~s maintenance, subm~tting periodic repor~s on a <br />schedule set by the Board. AlI reports will be filed with the Board or at a location specified by <br />~he B o ard." <br />A Post-Imp~ementation Sta~us Report must inc~ud~e the following elemen~s: <br />1, An assessment of whether ~he prajec~ continues to m.ee~ ~he goals spec~fied in the Grant <br />Agreement. <br />2. A descr~p~~on af any ma~ntenance o~ modifica~ions made since project conap~e~ion or since <br />the las~ S~a~us Report, v~hichever was last. <br />3. An accounting of any costs assoc~ated wi~h project maintenance and reporting to ~he <br />Board. <br />4. A summary of any public awareness or educatianal activ~ties relate~ to ~he project <br />under~aken since projec~ completion or since ~he last Sta~us Repor~, ~rhichever was ~ast. <br />5. Lessons Iearned from the pro ject. <br />Un~ess o~herwise specified, ~he Grantee will provide colar pha~os of all pro~ec~ elements ~i.e., <br />fencing, planting, or s~ructures~ ~o show compliance of the project with ~he Board fundin <br />g <br />decision, Pho~o points vvi~l be se~ up, and the color pho~ographs should be taken wi~h ~he <br />same foca~~leng~h Iens at ~he same time of yea~, showing can~~tions before and after pra~ect <br />comple~ion. ~ru~delines for pho~o poin~ documenta~ion are pravided on the D~VEB Websi~e <br />at; ht~ ://www. oweb.state, or, u~~/4WE~3/docs/ ubs/PhotoPoint 1~Ioni~orin ~ac J~l 2~07. d: <br />Photos must be taken: <br />~. At ~he same loca~ion as pho~ographs from before projec~ implemen~ation ~see Exhibi~ ~}; <br />2. Upon praj ec~ comple~zon; and <br />3. For each year the Baard requires a S~a~us Report. ~See reporting requirements far this <br />grant in Section J.} ~ <br />NaTE: See Exhibit B for any Spec~a~ Conditions applying to ~he Post-~mplementa~ion <br />Statu~ Report. <br />07-09 Capital Grant a9-14-07 PV 4R~50 ~~, ~ 1 <br />~ ~ <br />~ ~ <br />~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.