<br /> ' City of Eugene WBGS Architecture 8~ Planning <br /> Amazon Park Restroom October 25, 2004 -Revised <br /> Proaosal for Archfteetural and Enafneerina Servicaa - <br /> 2. Site work, beyond 15 feet from the perimeter of the building walls. We assume the City <br /> of Eugene will provide all site work outside of 15 ft. <br /> 3. Landscaping Architecture services, which will be provided by the City of Eugene. <br /> 4. Civil Engineering services, which will be provided by the City of Eugene. <br /> 5. Grading of the restroom, including adequate information to establish the finished floor <br /> elevation. We assume the City of Eugene will provide this information. <br /> 6. Erosion control requirements. <br /> 7. Preparation of Electronic Record Documents. <br /> 8. 3-d drawings. <br /> i <br /> 9. Building permit application <br /> 10. Review of contractor's pay applications. <br /> Total Fee Proposal: $7 825 for Design Development Phase <br /> Total Fee Estimate for remaining phases: 19174. <br /> Billing Rates for Hourly Services <br /> Billing rates for staff, charges for consultant services are as indicated below. Rates are <br /> j subject to change after December 31, 2004. <br /> WBGS <br /> Senior Prinapal Architect $115 Designer 2 $45 <br /> Principal Architect $110 Designer 1 $40 <br /> j Assoaate Architect $80 IS Techniaan $60 <br /> Interior Designer $75 Office Manager $60 <br /> Senior Staff Architect $70 Project Assistant $42 <br /> ~ Staff Architect 2 $60 Administrative Assistant $32 <br /> Staff Archfted 1 $55 Part-time Intem $35 <br /> ! Designer 3 $50 <br /> I <br /> i <br /> Schedule <br /> j We recommend allocating 4 weeks for Design Development. We intend to provide a more <br /> complete schedule at the end of the DD phase. <br /> Thank you for your consideration. We are prepared, and eager to begin this work as soon <br /> as possible, and the schedule has been established accordingly. <br /> I <br /> Please contact me if I can answer any questions. <br /> I <br /> Sincerely, <br /> Curtis Wilson, AIA <br /> Principal, WBGS Architecture and Planning, PC <br /> File: Amazon_Park RR-Scope_of Work Summary_2.doc Page 11 of 13 <br /> <br />