Amazon Park (Zig-Zag) Bridge <br /> Preliminary Structure Planning Cost Analysis <br /> December 8, 2004 <br /> zrr. <br /> 0210. MOBlLl7ATION ALL LS ALL $13,130 <br /> 01000 ACCESS AND RESTORATION OF SURFACES ALL LS ALL 57,500 <br /> BRIDGE ITEMS <br /> 0510 STRUCTURE EXCAVATION 350 CY 12 5600 <br /> 0510 GRANULAR WALL BACKFILL 340 GY 8 3240 <br /> 0510 SHORING, CRIBBING ALL LS ALL ST 500 <br /> 0520 FURNISH PILE DRIVING EQUIPMENT ALL LS ALL 320,000 <br /> 0520 FURNISH STEEL HP 14 X 89 PP PILES 540 LF 140 ~ 55,600 <br /> 0520 DRIVE STEEL PILES 3400 EA 4 51,600 <br /> 0520 REINFORCED PILE TIPS 5150 EA 4 3600 <br /> 0530 REINFORCEMENT 31.65 POUND 2,500 54,125 <br /> 0540 CLASS 3300 CONCRETE END.BENTS 3350 CY 12 54,200 <br /> 0560 STRUCTURAL STEEL INT PIER TUBESlICNEE BRACES 32.50 POUND 11 000 327,500 <br /> 0560 STRUCTURAL STEEL CURVED STRINGERS 35.00 POUND 3,500 517,500 <br /> 0570 TIMBER DECKING ~ 33,500 MFBM 1.2 54,200 <br /> 0587 DECORATIVE BRIDGE RAILING ON ~ OFF OF BRIDGE $85 LF 200 317 000 <br /> SUBTOTAL' 5131,295 <br /> <br /> _ PRELIM. ESTIMATED CONSTRUCT{ON CONTINGENCIES @2096: 526 260 <br /> TOTAL ESTIMATED BASE GOST: 3157 555 <br /> Stnicturat steel taken to level of deck Sculptural Ornaments above deck by Artist. <br /> <br />