'Emily Proudfoot ~ ? c~~srclr~s <br /> December 8, 2004 i ErsiNEres <br /> Page 4 <br /> Structural shop drawing review (structural steel, pile hammer and piling, concrete, <br /> reinforcement, etc.) <br /> ¦ Resolve structural bridge related field issues arising from the work. <br /> ESTIMATED FEE <br /> The attached spreadsheet indicates the anticipated hours and associated fee required to complete the <br /> tasks as outlined above. At this time OBEC proposes to perform the work on atime-and-material- <br /> basis not-to-exceed $37,910 with Extra Work for Hydraulic Analysis of $3,540 as shown on the fee <br /> spreadsheet. Rates aze based on OBEC's current City of Eugene Personal Services Contract for <br /> Architecture and Engineering. <br /> ESTIMATED CONSTRUCTION COST <br /> For your planning purposes, you requested a cost estimate for the bridge as a part of our proposal. <br /> Based on current average unit prices and a take off of approximate quantities, we estimate the bridge <br /> will cost approximately $157,555. This cost includes 20 percent ($26,260) for possible <br /> contingencies. This estimate will obviously be refined as design progresses. <br /> SCHEDULE <br /> It is our understanding that the City desires to bid this project in summer of 2005. OBEC is <br /> prepared to actively work with the City and ar#ist to pursue completion of our work by May ~ 1, <br /> 2005. <br /> <br /> J' We hope this proposal provides the City of Eugene with the required information. Please do not <br /> hesitate to call if you have any questions or need additional information. <br /> Sincerely, <br /> O..~. <br /> Gregory W. Ausland, P.E. <br /> Sr. Project Manager <br /> GWA/mlh <br /> Enclosures <br /> <br />