New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3900 Land Planning Consultants Reimbursement - FFA (2)
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3900 Land Planning Consultants Reimbursement - FFA (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 7:39:35 PM
Creation date
7/1/2008 11:11:04 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
Yes
External_View
No
GJN
003900
GL_Project_Number
915142
Identification_Number
2005008494
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
` EYecudon Drait <br /> <br /> p~_ B. Design and construction of streets, utilities, pedestrian a~ad bicycle access, <br /> stormwater facilities and wetland mitigation azeas in a manner hat will maximize <br /> both the development potential of OWNERS' portion of the CSC Tract and the <br /> development of the Pazklands for their intended purposes; <br /> C. Development of recreational facilities to serve the Santa Clara community; and <br /> i <br /> D. The Pazklands will include a corridor of land (referred to h ~ ein as the "Water <br /> Course") to protect and preserve an existing east-west drainage ~iwale that transects <br /> .the SC Tract approximately 2,000 feet north of its southern bo ` dary. The Water <br /> Course will be approximately 80 feet wide to provide a buffer zo a of approximately <br /> 30 feet on each side of the swale. The Water Course will f rm a fundamental <br /> component of the storm water management system for the SC Trac~. <br /> i <br /> 2.4.2 Location of Major Streets. Designation of all arterial stc~ets and all lesser <br /> streets that will abut or provide vehicular passage through the Parkland. <br /> i <br /> 2.4.3 Location of Major Utilities. The location of all utilities that ~nll deliver service <br /> to the Parklands or that will pass through the Parklands to serve other az~aas, and the location <br /> of any utility substations that will be placed in or adjacent to any part o~f the Parklands. <br /> 2.4.4 Metro Plan Requirements. All determinations must be prodded for the Metro <br /> „ Plan, including, without limitation, all maps, surveys and depictions of proposed <br /> commercial and residential areas. t <br /> i <br /> Z.4.5 Other Items. Additional items or alternatives to the items i 'subsections 2.3.2, <br /> 2.3.3 and 2.3.4 that both parties agree should be determined prior to tt~e UGBlMetro Plan <br /> amendment. <br /> I. <br /> 2.4.6 Binding Commitment. Prior to the effective date of the ~[JGB amendment, <br /> OWNERS and PARKS shall execute one or more written contracts or instruments to <br /> . establish the Preliminary Plan. The Preliminary Plan shall incorporate this Agreement <br /> and may be amended as required to reflect additional agreements between the parties and <br /> to comply with applicable federal, state or local laws. ~ <br /> f <br /> 3. Cost Sharing. <br /> 3.1 Consultants. PARKS and OWNERS shall each be res onsible For one-half of the <br /> fees and expenses of the consultant hired ~to prepaze the Metro Plan am dment application <br /> and one-half of the fees and expenses of any other consultant retained und~ subsection 2.2. <br /> "r <br /> i <br /> . ~ <br /> Urban Lands and Parks Pre-Planning Development Agreement Page 4 of 9 <br /> i <br /> 's <br /> i <br /> i <br /> 40D I~j SOd '8 ONJ,At~ Md ~1~i~9Rd Z88fi~ Z89 T~5 %v3 £Z ~ TT H03~ ~0/5Z%OT <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.