New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
PAF3951
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
PAF3951
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 2:24:26 PM
Creation date
7/1/2008 9:53:07 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Authorization
PW_Active
No
External_View
No
GJN
003951
GL_Project_Number
935182
Retention_Destruction_Date
11/5/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
;i ~ . <br /> <br /> • Project AM06A <br /> Maintenance Requirements <br /> i <br /> Facility Type Annual Maintenance Activities <br /> 4r CSP (2-5 ff. cover) WA <br /> Wet Extended Detention Pond Inspect and clean inlet and outlet, maintain vegetation, inspect sediment <br /> loading, remove sediment, remove debris, inspect and repair separation <br /> bemt. <br /> Open Channel Improvements (type 1) Inspect sediment loading and vegetation, remove sediment and debris. <br /> i <br /> I <br /> i <br /> CSWMP Objectives and Policies Addressed by the Capital Project <br /> Flood Control <br /> s capital project is expected to eliminate the predicted capacity problem for the 10-year design stone under <br /> e land use conditions identified for pipe Segment AMHW0106. Segment AMHWO106 is a 352 ft beg 48' CSP <br /> ch ems west beneath Martin Dr. and discharges into the Amazon Creek ; <br /> I <br /> I Water Quality <br /> iThis neighbortrood water quality facility will provide treatment of s'tormwater runoff from a 214-acre drainage area. <br /> )with an estimated annual discharge of 37,000 Ibs of TSS under future land use corxlitions (60% low-density <br /> residential, 40% parks and open space). This CP is expected to remove 18,000 o_f the 37,000 Ibs/yr of TSS. <br /> _ <br /> Watural Resources <br /> :This capital project will provide natural resource enhancement of approximately 0.72 acres. <br /> i <br /> i <br /> i <br /> Other City Objectives Addressed by the Capital Project <br /> ITo be completed by the City <br /> . ii j <br /> C <br /> $ - <br /> Constnfction Costs: $554,300 <br /> i Engineering/Administration: $110,860 <br /> Site Acquisition $0 <br /> ' <br /> Capital Project Implementation Costs $665,100 i <br /> i <br /> Annual Maintenance Costs $11,200 ~ <br /> Page 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.