New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4003 KCM Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4003 KCM Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2008 7:54:46 PM
Creation date
6/30/2008 2:25:46 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004003
GL_Project_Number
915046
Identification_Number
2005100395
COE_Contract_Number
2005-00226
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
z <br /> PERSONAL SERVICES CONTRACT <br /> Architect and Engineer <br /> BETWEEN: The City of Eugene, an Oregon <br /> Municipal Corporation <br /> AND: KCM Inc. dba Tetra Tech/KCM, Inc. <br /> Contract No.: 2005-00226 <br /> This contract is being established per the terms and conditions of Personal <br /> Services Master Contract master contract 2005-00206 dated September 22, <br /> 2004, between the City of Eugene (City) and KCM Inc. dba Tetra Tech/KCM, <br /> Inc.(Contractor). <br /> City and Contractor mutually agree to the attached scope of work as outlined <br /> herein and the contract referenced above as follows: <br /> Tetra Tech staff will perform the additional hydrologic analysis that is <br /> required to enable Army Corps of Engineers (ACOE) staff to finalize the <br /> design on the culverts and weirs for the Delta Ponds project. The ACOE did <br /> not complete the hydrologic analysis during the feasibility phase of the <br /> project and the City and ACOE have recognized that the additional work <br /> must be done before the project design phase can move forward. The <br /> ACOE has approved the additional study and will match the City's <br /> expenditure as agreed in the Project Cooperation Agreement. The <br /> termination date for this agreement is July 31, 2005. <br /> All other terms and conditions of master contract #2005-00206 apply to this <br /> scope of work and remain in full force and effect. <br /> CITY OF EUGENE CONTRACTOR <br /> c'"'~- <br /> Mark Schoening J D Min , P.E <br /> City Engine~e/r is esident/Branch Manager <br /> <br /> ~r Date: ~ f 3~ ~o ~ Date: ~ ~ ~ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.