tetra Tech Fee Proposal Attachment C: Costs <br /> <br /> Contrad P08523-0001-01 <br /> <br /> Task Order #001 <br /> Modification 00 <br /> Project: Eugene Delta Ponds Perrnittlng <br /> Eugene Delta Ponds Permit Support Fee Proposal <br /> TASK DESCRIPTION LABOR, INCLUDING OVERHEAD <br /> Principal QA/(3C Sr. Proj. Hydraulic Staff Drafter / AdmiNCU <br /> Manager Engineer Engineer CADD cal <br /> $210 $189 $185 $144 $89 $69 $45 <br /> 1 Compile and Review Existing Information 4 8 8 4 <br /> 2 Hydrologic Analysis 4 4 4 4 <br /> 3 Hydraulic Analysis 4 28 32 4 <br /> 4 Floodplain Mapping 4 12 12 24 <br /> 5 Report Preparation 4 24 16 12 8 <br /> 8 City and FEMA coordination 2 4 <br /> 7 Principal / Contrad Management 2 8 8 <br /> HOURLYSUBTOTALSBYDISCIPLINE 2 22 8 80 72 44 20 <br /> Itemized Travel and Materials <br /> MATER/ALS AND REPRO <br /> LABOR SUBTOTAL x27,922.00 <br /> TRAVEUMATERUILSSOBTOTAL xgg7.00 Descri lion <br /> Total Contract Value x28,759.00 Color Co in <br /> 8.5 x 11 commies <br /> 11 x 17 co ies with foldin <br /> Oversize co ies r s.f. <br /> Bindin <br /> Com uter <br /> Com uter Time CADD <br /> TOTAL MATERIALS <br /> TRAVEL <br /> Descri lion <br /> Mileage for Coordination with Loci <br /> TOTAL TRAVEL <br /> <br />