New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4048 Environmental Solutions Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4048 Environmental Solutions Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 10:57:48 AM
Creation date
6/27/2008 1:21:41 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004048
GL_Project_Number
935072
Identification_Number
2006001475
COE_Contract_Number
2005-05306
Retention_Destruction_Date
7/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> ~r Exhibit B <br /> Environmental Solutions, LLC <br /> Nancy Holzhauser: Consultant <br /> 2540 Pierce Street Phone: (541) 343-6585 <br /> Eugene, Oregon <br /> 97405 <br /> Fax: (541) <br /> 338-7676 <br /> August 20, 2004 <br /> Philip Richardson <br /> City of Eugene Parks and Open Spaces <br /> 1820 Roosevelt Blvd. <br /> Eugene, OR 97402 <br /> PROPOSAL FOR PROVIDING WETLAND CONSULTING SERVICES <br /> For the Candlelight Park Site, Eugene, OR <br /> Dear Philip: <br /> Based on our meeting yesterday, it is my understanding that you are interested in having the <br /> existing wetland delineations that have been completed for the Candlelight Park site reviewed <br /> and field checked to incorporate modifications that maybe required, especially for the north <br /> portion of the site that was completed in 1997. In addition, you are interested in having a Joint <br /> Removal Fill Permit application (JPA) completed for the proposed construction project. This <br /> proposal has been prepared with the assumption that mitigation for wetland impacts will be <br /> accomplished through purchase of credits from a wetland mitigation bank, based on your <br /> comments yesterday. <br /> 1.0 PROJECT APPROACH <br /> 1.1 Wetland Delineation Review and Update <br /> The 2000 wetland delineation report prepazed by Satre Assoc. and the 1997 wetland delineation <br /> report prepared by Scott Craig will be reviewed. Concurrence for the 2000 delineation has not <br /> expired, therefore field work associated with review of that delineation is anticipated to be <br /> minimal. Concurrence for the Scott Craig delineation has expired, therefore it is anticipated that <br /> the north portion of the site will require more extensive field work. The wetland delineation <br /> study for that portion of the project azea will be completed using the three-pazameter approach <br /> (vegetation, soils, and hydrology) to determine jurisdictional wetlands in accordance with the US <br /> Army Corps of Engineers (Corps)1987 Wetland Delineation Manual. A delineation report <br /> update will be completed which should satisfy the requirements of both the Oregon Department <br /> of State Lands (DSL) and the Corps. All wetland/upland boundaries and sample plots will be <br /> marked in the field; this proposal does not include the cost for having the plots and boundaries <br /> professionally surveyed. This proposal has been prepared with the understanding that the city of <br /> Eugene will arrange for the survey to locate and map the sample plots and any wetland/upland <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.