|
<br /> r
<br /> Run Date: 6/22/2005 1~~~// Page 1
<br /> City of Eugene
<br /> Bid Tabulation
<br /> Bid #2005-000018
<br /> Job No. 93-004091
<br /> JUDKINS POINT NORTH WIDENING OF ROADWAY ALONG GLENWOOD BOULEVARD FROM THE INTERSTATE HIGHWAY NORTH APPROXIMATELY 7D0 FEET, WIDENING EXIT 191 ON/OFF RAMP FROM
<br /> GLENWOOD BOULEVARD
<br /> EAST APPROXIMATELY 200 FEET
<br /> Engineer's Estimate Eugene Sand & Gravel Wildish Construction Delta Construction
<br /> Line
<br /> No. Description uantit Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
<br /> General
<br /> 10 MOBILIZATION 1 LUMPSUM $20,000.00 $20,000.00 $30,000.00 $30,DOO.OD $18,700.00 $18,700.00 $47,709.00 $47,709.00
<br /> 20 EROSION AND SEDIMENT CONTROL 1 LUMPSUM $1,500.00 $1,500.00 $600.00 $600.00 $4,500.00 $4,500.00 $700.00 $700.00
<br /> 30 SEDIMENT FENCE 460 LINFT $1.00 $460.00 $2.50 $1,150.00 $5.00 $2,300.00 $3.50 $1,610.00
<br /> 40 STORM INLET PROTECTION 3 EACH $200.00 $600.00 $50.00 $150.OD $50.00 $150.00 $57.00 $171.00
<br /> 50 ROCK CHECK DAMS 5 EACH $30.00 $150.00 $75.D0 $375.00 $200.OD $1,000.00 $575.00 $2,875.00
<br /> 60 CONSTRUCTION ZONE FENCING 21 LINFT $1.00 $21.00 $5.00 $105.00 $2.00 $42.00 $3.50 $73.50
<br /> 70 TREE PROTECTION 100 LINFT $1.00 $100.00 $3.00 $300.00 $2.OD $200.00 $3.50 $350.00
<br /> BO REMOVAL OF STRUCTURES AND OBSTRUCTIONS 1 LUMPSUM $10,000.00 $10,000.00 $10,000.00 $10,000.00 $5,500.00 $5,500.00 $2,185.00 $2,185.00
<br /> 90 CLEARING & GRUBBING 1 LUMPSUM $3,000.00 $3,000.00 $5,000.00 $5,000.00 $B,000.OD $8,000.00 $700.00 $700.00
<br /> 100 GENERAL EXCAVATION 807.3 CUYD $20.00 $16,146.00 $25.00 $20,182.50 $30.OD $24,219.00 $25.70 $20,747.61
<br /> 110 6" SUBGRADE STABILIZATION 50 CUYD $20.00 $1,OOO.OD $28.00 $1,400.00 $27.00 $1,350.00 $46.00 $2,300.00
<br /> 120 CONCRETE INLET, TYPE M-E 1 LUMPSUM $1,500.00 $1,500.00 $2,500.00 $2,500.00 $1,500.OD $1,500.00 $4,000.00 $4,000.00
<br />
<br /> ~ 130 12" STORM PIPE 20 LINFT $40.00 $BDO.OD $50.00 $1,000.00 $45.00 $900.00 $29.00 $580.00
<br /> 140 AGGREGATE BASE, 18 INCHES THICK 745 CUYD 3~~y 00 $9,685.00 $31.50 $23,467.50 $45.OD $33,525.00 $32.00 $23,840.00
<br /> 150 LEVEL 4, 3/4" DENSE GRADED HMAC 414.1 TON $60.00 $24,846.00 $56.00 $23,189.60 $65.00 $26,916.50 $63.25 $26,191.83
<br /> 160 LEVEL 4, 1/2" DENSE GRADED HMAC 165.6 TON $60.00 $9,936.00 $61.00 $10,101.60 $68.00 $11,260.80 $70.00 $11,592.00
<br /> 170 GUARD RAIL, TYPE 2A 575 LINFT $25.00 $14,375.00 $35.00 $20,125.00 $27.00 $15,525.00 $30.00 $17,250.00
<br /> 180 GUARD RAIL END PIECES, TYPE C 4 EACH $500.00 $2,000.00 $95.00 $380.00 $1,000.00 $4,000.00 $1,150.00 $4,600.00
<br /> 190 PAVEMENT LEGEND, TYPE B, ARROWS 9 EACH $100.00 $900.00 $160.00 $1,440.00 $165.00 $1,485.00 $185.00 $1,665.00
<br /> 200 PAVEMENT LEGEND, TYPE B, STOP 3 EACH $75.00 $225.00 $85.00 $255.00 $85.00 $255.00 $100.00 $300.00
<br /> 210 ATTACH GUARD RAIL TO BRIDGE BARRIER 2 EACH $500.00 $1,000.00 $3,600.00 $7,200.00 $3,600.00 $7,200.00 $4,025.D0 $8,050.00
<br /> 220 PERMANENT PAVEMENT STRIPING TAPE 1 LUMPSUM $11,175.00 $11,175.00 $12,000.00 $12,000.00 $12,000.00 $12,000.00 $13,820.00 $13,820.00
<br /> 230 PERMANENT SIGNS 1 EACH $300.00 $300.00 $250.00 $250.00 $200.00 $200.00 $300.00 $300.00
<br /> 240 REMOVAL AND REINSTALLATION OF EXISTING SIGNS 4 EACH $300.00 $1,200.00 $450.00 $1,800.00 $725.00 $2,900.00 $1,265.00 $5,060.00
<br /> 250 REMOVAL AND REINSTALLATION OF HIGHWAY ILLUMINATION 3 EACH $1,000.00 $3,000.00 $800.00 $2,400.00 $825.00 $2,475.00 $920.00 $2,760.00
<br /> 260 PERMANENT SEEDING 0.2 ACRE $1,600.00 $320.00 $5,000.00 $1,OOO.DO $5,500.00 $1,100.00 $6,900.00 $1,380.00
<br /> Grand Total: $134,239.00 $176,371.20 $187,203.30 $200,809.94
<br /> i~ I~? 6~9q
<br /> ` - ~r ~ 9'r
<br /> ~ I,~s ~69;1~6~3{
<br />
<br /> i
<br />
<br />
|