' 19-May-04 <br /> PROJECT: 4136 JOB NO:_ 4136 <br /> COMMENTS: <br /> FRBP ROYAL PARKING LOT <br /> CD ORIGINAL UNIT <br /> CLASSIFICATION OF WORK CODE UNIT QUANTITY PRICE AMOUNT <br /> 1 MOB, DEMOB $ CLEANUP 1000 LS 1 $4,225.20 $4,225.20 <br /> 2 CLEARING & GRUBBING 1001 LS 1 $2,012.00 $2,012,00 <br /> 3 4" CONCRETE WALK 1227 SF 14976 $2.50 $37,440.00 <br /> 4 8" CONCRETE WALK (2 12X5) 1231 SF 120 $5.00 $600,00 <br /> 5 12" STORM PIPE PVC INCLUDE TV INSP) 3485 LF 25 $40.00 $1,000.00 <br /> 6 CB 3079 EA 1 $1,200.00 $1,200,00 <br /> 7 $0.00 <br /> 8 $0.00 <br /> 9 $0.00 <br /> 10 $0.00 <br /> <br /> 11 $0.00 <br /> SUB TOTAL $46,477.20 <br /> CONTINGENCY 15 $6,971.58 <br /> SUB TOTAL $53,448.78 <br /> ENGINEERING 25% $13,362.20 <br /> TESTING 2% $1,068.98 <br /> ADMINISTRATION 5% $2,672.44 <br /> TOTAL $70,552.39 ~7O ~ <br /> ~~o ~ <br /> D , <br /> <br />