Schedule: <br /> 1 Elcon will follow the project schedule, required by the City. <br /> <br /> Deliverables: <br /> 1 Design documents (drawings and specification) (60%, and 100%) -three copies of half size <br /> drawings and three copies of Div 16 specifications. <br /> 2 100% stamped documents set will be include one full size copy of all electrical drawings, and one <br /> set of electrical specifications. An electronic file of drawings and specification will also be part of <br /> the submittal. We understand that City will make necessary copies of the document to compile the <br /> bid documents. <br /> Following is the anticipated list of drawings for this project: <br /> 1. Legend and Abbreviations <br /> 2. One-Line Diagram <br /> 3. Electrical Site and Wet Well Plan <br /> 4. Electrical Vault plan <br /> 5. Electrical Vault Demolition plan <br /> 6. Pump control schematic. <br /> 7. Conduit and Panel schedule. <br /> 8. Details and elevations -Sheet 1-3 <br /> Thank you for the opportunity to work on this project. If you have any questions please contact me at <br /> (503) 644-2490. <br /> Sincerely, <br /> ELCON Associates, Inc <br /> ~ <br /> Amit Sinha, PE <br /> Enclosure: Fee Estimate (Revision 1, Date: Apri129, 2004) <br /> Proposal Division PS.doc Page 3 of 3 <br /> Y Schedule/Status Y Communications Y Correspondence <br /> 7 Field Data Y Equipment Info. Y Meeting Notes Y <br /> Y Specifications Y Calculations Y Cost Estimates <br /> <br />