Mr. Terry Colvin P03-001 <br /> <br /> ~rr (revised) June 20, 2003 <br /> Page 3 <br /> FEE <br /> Ford & Associates, Inc. will provide the above-defined services on a "fixed-fee-not-to- <br /> exceed° basis for each option, listed in the chart below. Each fee reflects wholly separate <br /> timetables for producing plans, specifications and record drawings. <br /> Reimbursable direct expenses, such as reproduction, will be billed at cost plus ten <br /> percent in addition to the maximum total fee. For our current rates, please refer to Price <br /> Agreement for Engineering Consulting. Construction Engineering, and Surveying <br /> Services, file: #0739-791-9971, #3. <br /> ...Options Construction Engineering Total <br /> 1. Pedestrian Median and Crosswalk $23,700 $9,500 $33,200 <br /> 2. Sidewalk Widening 8~ New Driveway $18,800 $3,950 $22,750 <br /> 3. Sidewalk & Driveways Reconstruction $33,100 $4,500 $37,600 <br /> ~r Totals: $75, 600 $17,950 $93, 550 <br /> We look forward to receiving the topographic survey drawing recently completed by City <br /> of Eugene: <br /> Thank you for the opportunity to revise our proposal. <br /> Sincerely, <br /> Ford & Associates <br /> Ryan <br /> Sisson, <br /> Project Manager <br /> <br />