New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4151 MIG Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4151 MIG Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2010 4:27:45 PM
Creation date
6/26/2008 10:44:09 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004151
GL_Project_Number
935262
Identification_Number
2004100118
COE_Contract_Number
2004-05303
Retention_Destruction_Date
5/29/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RIVERPLAY WORK PLAN <br /> a <br /> <br /> ' ~f ' 14.0 FINAL CONCEPT PLAN <br /> x ~ ~ t ~ Based on staff input, MIG will revise the draft concept plan and produce <br /> N a the final concept plan for each play area. The drawings will be hand <br /> ' ' drawn, incorporated electronically over the Autocad base. The final <br /> ~ ~ f concept plans will be in full color for communication and marketing <br /> purposes. Ideas for donar recognition will be included. <br /> Product; Final Concept Plan (2 sheets) <br /> 1 S.0 COST ESTIMATING/PHASING <br /> MIG will produce cost estimate and a preliminary phasing plan that idenu- <br /> fies items that may be donated or built by volunteers. <br /> Product: Cost estimate, preliminary phasing plan <br /> 16.0 PROJECT CLOSEOUT <br /> MIG will close out the project and provide the City with the final copies of <br /> all files and documents. <br /> Product: Project files <br /> i <br /> RiverPlay Work Plan I PAGE S <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.