RIVERPLAY WORK PLAN <br /> a <br /> <br /> ' ~f ' 14.0 FINAL CONCEPT PLAN <br /> x ~ ~ t ~ Based on staff input, MIG will revise the draft concept plan and produce <br /> N a the final concept plan for each play area. The drawings will be hand <br /> ' ' drawn, incorporated electronically over the Autocad base. The final <br /> ~ ~ f concept plans will be in full color for communication and marketing <br /> purposes. Ideas for donar recognition will be included. <br /> Product; Final Concept Plan (2 sheets) <br /> 1 S.0 COST ESTIMATING/PHASING <br /> MIG will produce cost estimate and a preliminary phasing plan that idenu- <br /> fies items that may be donated or built by volunteers. <br /> Product: Cost estimate, preliminary phasing plan <br /> 16.0 PROJECT CLOSEOUT <br /> MIG will close out the project and provide the City with the final copies of <br /> all files and documents. <br /> Product: Project files <br /> i <br /> RiverPlay Work Plan I PAGE S <br /> <br />