~oosioo9 <br /> - q.58 FAX 541 882 80J0 CITY EUGENE PW ENG <br /> Work shalt begin withtn flue (5) days atterNotlcet~ Proceed Is Issued. <br /> 0280.00 Scope <br /> ADD: after first sentence <br /> Minimum flow of diverted water shalt tie 200 Gallons per Minute <br /> CHANGES TO SPECIAL SPECIFICATIONS: <br /> Alt mention of Excavation "off-site"~ shall be interchangeable with the alternative, Excavation "Long <br /> Haul" should that alternative be chosen. With the following exceptions. <br /> 00330.02 Definitions: <br /> Excavation "Long Fiaul" -That material being excavated from the project site and determined to be <br /> unsuitable to use within the project boundaries shall remain the property of the City and hauled to a storage <br /> area. The following information applies: <br /> • Storage Location: Eugene Sand and Gravel (North Property) at the north terminus of North pelts <br /> Hwy. Eugene, Oregon, approximately'/. mile past the Eugene Sand and Gravel Scale. See <br /> map. Contact: Mike Alltucker 683-6400 <br /> • Accoss: This site can tie accessed by truck and tra8er durfng daylight hours, generatly07:00Ahfito~ <br /> 07:00 PM. The site is gated by the owner. A gravel drive provides access to the storage area. <br /> Conditions of site: Material will tie delivered during access time to location shown. The area <br /> lease is approximately 2 acres. Material shall be stockpiled to a height of approximately 20 - 25 feet. <br /> Material shag be shaped to drain and placed such that drainage of the stockpile and surrounding <br /> area is alknned and no ponding of water occurs. Trenching around the stockpile to facilitate drainage <br /> may be required. Trenching is incidental to this bid'item. iVo seeding or cover will be required: <br /> • Regulations: OSHA and MSHA standards and regulations shall be compiled with. <br /> • Maintenance: The contractor shall maintain the gravel access to the initial condition and shall <br /> provide dust control and wheel washing during use oi' the site: Mair}tenartce is- inEiden#ai ~ this. bid <br /> item. <br /> Delete definition: <br /> EXCavatlOA "Off SitY" - <br /> Add definition: <br /> Excavation "off site" -That material being excavated from the projectsite-and determined to be <br /> unsuitable to use within the project boundaries. This material becomes the property of the Contractor• <br /> Dispose to an approved site. <br /> 00330.41 (a) l3eneral <br /> Delete (4) Excess material <br /> ~Idd (4j Excess Material <br /> Material not used an site will not be considered waste material if the alternate for Excavation "Long Haul" is <br /> awarded as part of the contract. <br /> <br /> Addendum #1 -Jab #4168 <br /> <br />