. :gg FAX 541 682 6030 CITY EUGENE PW $NG IQJ002i0ua <br /> Rubli~Ylfnrks <br /> Engineering <br /> City of Eugene <br /> 244 East Broadway <br /> Eu~ne. Oregon 97W01 <br /> (541) 682.5560 <br /> ADDENDUM N0.1 (54J) 882.8410 Fax <br /> TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS FOR <br /> DRAGONFLY BEND HABITAT ENHANCEMENT PROJECT LO~CATEirNEAR~ GREENHILL ROAIrAND <br /> ROYAL AVENUE ALONG THE "A "CHANNEL <br /> JULY 21, 2004 J013#4'f68 BtD~ NUMBED 21 <br /> TO ALL PLANHOLDERS: <br /> <br /> _ The following changes shall amend and supplement the project bidding documents only to the extent <br /> specil~raliy shown and noted: Ail other conditions shall remain the same. <br /> Bidders shall incorporate the effects of these changes in the appropriate bid items included in this <br /> addendum and ttre total of these f~id items therr~add- irr th~r appropriate piacae omth~-bid fem. <br /> CHANGES t0 BID SCHEDULE: <br /> (DELETE] Original Bid Schedule dated 07/0?./2004 <br /> (ADD) Revised Bid Schedule date 07/21/2004 <br /> CftANGES TO STANDARD SPECIFICATIONS: <br /> 00120.65 Opening and Cor?tparing Blds <br /> Delete and replace the second paragraph: <br /> 8fids wilt be compared orrthebasis ofthe-tntat-amottnt of each-bid-irtctudtng-elther <br /> Alternate No.1 or 2, at the discretion of the Engineer. Only one alternative will be chosen for <br /> comparison ofibids. <br /> 00130.00 Consideration of Bids <br /> ADD: <br /> The bid amount awarded wig Ire- based an ttte-amount ofi the bid, irrdudmgthe-altemal:ive <br /> chosen by the Engineer, of the Lowest responsible bidder. <br /> ''00130.50 Execution of Contract and Bonds: <br /> D"efete "10 Caiertdar Days"- in the first sentertcre. <br /> ADD: "5 Working Days" in ttto fnst senter>,ce. <br /> 00180.50 Contract Time to Campiete Work <br /> Addendum #1 -Job #4168 <br /> <br />