1 ; <br /> <br /> ' Dragonfly Bend Habitat Enhancement Project, Scope oJWork Page 3 <br /> Pack Water Resources, Inc. <br /> sought. PWR will not work outside the specified work scope or the authorized <br /> budget. <br /> Deliverables: <br /> • Brief technical memorandum consisting of approximately 3-5 pages <br /> • Redline markups of plans <br /> Estimated Fee <br /> The estimated fee for this work plan is shown on the attached schedule. We propose to <br /> perform this work in accordance with our existing price agreement (#0739-791-9971 <br /> #27). Staff assigned to this project will be: project manager -Phil Pommier, P.E., <br /> geomorphologist -Habib Matin, Ph.D., P.E, QA/QC engineer -Roger Sutherland, P.E. <br /> project engineer -Ken Elbert, P.E., CARD technician - Swetha Krishnan, and <br /> administrative support services -Kathy Kerth. <br /> Schedule <br /> Upon receipt of authorization and the 60% plan set PWR will begin work. PWR will <br /> complete its review and provide an initial draft report within 3 weeks of plan receipt. <br /> PACIFIC <br /> WATER RESOURCES INC. <br /> <br />