New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4180 Oregon Woods Contract
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4180 Oregon Woods Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2010 2:34:23 PM
Creation date
6/25/2008 1:45:31 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004180
GL_Project_Number
945212
Identification_Number
2005100263
COE_Contract_Number
2005-00019
Retention_Destruction_Date
11/17/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Oxine Copper shalt meet AWPA P-8. Solvent for Oxhe Copper shall be I-ight Oil (Type C <br /> Solvent) meeting AWPA P-9. <br /> Alt treated wood products In this project shall be produced and comply with the requirements of <br /> the "Best Management Practices for Treated Wood in Aquatic Environments' (BMP's), most <br /> current edition, as issued by the Western Wood Preservers Institute. The producer of the <br /> treated wood products shalt provide written certification that the 8MP's were utilized, including a <br /> description and appropriate documentation of the BMP's used. <br /> (CLARIFY) All approved field cuts, with the exception of the bridge rail system members, shall be treated <br /> per the General Notes on sheets 16 and 17 and the speoifloatlons. All approved field cuts and <br /> abrasions in rah systems members shall be treated as noted on Sheet 20. <br /> CHANGES TO SPECIAL PROVISIONS: <br /> (Rt;VI$E) 00120.00 Prequaliflcatlon of Bidders <br /> Revise Item 1 - Qual'fiaations, Bullet 3 - ProJact Scope and Scalo to road: <br /> • Protect scale and scope -Bidder shall have sucxessfully completed at least three trail <br /> projects of equal or longer length as this project. The Bidder shall have successfully <br /> completed construction of at least two timber frame trail Ixidges of 25'-0" in length or <br /> three timber frame bridges of 20'-0" in length. The bridge reifing system fabricator shall <br /> have successfully fabricated at least Iwo railing systems of 20'-0" in length requiring <br /> round pole-type bridge rails. The bridge rail'mg system installer shall have successfully <br /> installed at least two trail bridge wood railing systems of 20'-0" in length. The Bidder <br /> shall have completed at least three puncheons of 30' length. 6'idder shall have , <br /> • - successfully completed construction of two wood rebining walls of 48" height or three of <br /> 36' height. <br /> (REVISE) 0015060(d) Construction Equipment Resttlctlons <br /> All mechanical and/ or motorized equipment utilized ~ the performance of this contract shall <br /> have a maxknum ground botpr(nt with of 42" and shall b® tracked. The trail bed design width <br /> shall be met and not exceeded at the completion of construction. <br /> If you have questions about this addendum or the project, please call Adam Steffen at (541) 682-5040. <br /> All bidders shall acknowledge the reoelpt of and acceptance of this Addendum No. 4 by signing and submitting <br /> the signed Addendum rnrith the bid. Bids submitted without this Addendum, or with the Addendum not signed, will <br /> be co ' er anal. <br /> <br /> 1'"- <br /> Ma choening, P. <br /> City Engineer <br /> Receipt acknowledged and conditions agreed <br /> this day of OC ~ , 2004. <br /> Bidder: 0~~"Qd (,~v~t7S L.- <br /> By. <br /> Addendum #4 - Job #41130 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.