<br /> Run Date: 10/11/2005 16:07:• Run Date: 10/11/2005 16:07:47 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 004 <br /> Contractor: 2G CONST. Contractor: 2G CONST. Original Contract: $439,927.43 <br /> Job 93-004172 Job 93-004172 Current Amount: $457,090.08 <br /> Contract No: 2005-00030 Contract No: 2005-00030 Contract Award Date: 05/27/2005 <br /> PO 2005050486 pp 2005050486 Completion Date: 10/07/2005 <br /> Assessable: Yes Assessable: Yes <br /> Current Contract Estimated Payment Cumulative Total: <br /> <br /> Line Description Line Description Last Chng Ord Unit Price Uait Measure Quantity Amount ¢uantity Amount Quantity <br /> <br /> 1560 RENTAL RATS ADJUST! 1360 TEMP PROTECTN/DIRECTN $7,836.00 LUMPSUM 1.000 $7,836.00 0.600 $4,701.60 1.000 <br /> 1370 TRSH PROTHCTZON FBliCING $5.17 LINFT 30.000 $155.10 60.000 $310.20 60.000 <br /> 1380 EROSION CONTROL $303.00 LUMPSUM 1.000 $303.00 0.600 $181.80 1.000 <br /> 1390 10" DRAIN PIPS $28.83 LINFT 102.000 $2,940.66 0.000 $0.00 82.000 <br /> 1400 ADNST CLEANOUT $152.00 EACH 1.000 $152.00 1.000 $152.00 1.000 <br /> 1410 MINOR ADJUSTMHNT OF MANHOLES $297.00 EACH 1.000 $297.00 1.000 $297.00 1.000 <br /> 1420 CATCH BASINS $1 022.00 EACH 1.000 $1,022.00 0.200 $204.40 1.000 <br /> 1430 CONNECTION TO EXISTING STRUCTU $179.00 EACH 1.000 $179.00 0.000 $0.00 1.000 <br /> 1440 GENERAL EXCAVATION $20.78 CUYD 80.000 $1,662.40 80.000 $1,662.40 80.000 <br /> 1450 SUBGRADE STABILIZATION $13.86 CUYD 47.000 $651.42 0.000 $0.00 0.000 <br /> 1460 SUBGRADE GEOTEXTILE $1.03 SQYD 284.000 $292.52 0.000 $0.00 0.000 <br /> 1470 3/4 INCH-0 AGGREGATE BASE SURF $1.80 SQFT 61.000 $109.80 27.000 $48.60 27.000 <br /> 1480 LEVEL 2, 1/2 INCH DHNSS HMAC $6.31 3QFT 323.000 $2,038.13 438.500 52,766.94 438.500 <br /> 1490 PLAIN CONC PVMNT, UNDOWELLBD, - $5.50 SQFT 2,549.000 $14,019.50 2,549.000 $14,019.50 2,549.000 <br /> 1500 CONCRETE PUMPING $0.21 SQFT 2,642.000 $554.82 0.000 $0.00 0.000 <br /> 1510 1 1/2"-0 AGGREGATE BASH $18 04 CUYD 63.000 $1,136.52 0.000 $0.00 0.000 <br /> 1520 5 ZNCH CONC SURFACING $4.56 SQFT 93.000 $424.08 0.000 $0.00 0.000 <br /> 1530 TOPSOIL $4.29 SQHT 36.000 $154.44 62.000 $265.98 61.000 <br /> 1540 TIS BARS $6.49 BACH 32.000 $207.68 32.000 $207.68 32.000 <br /> 1550 SAW CUTTING $1.93 LINFT 294.000 $567.42 251.000 $484.93 265.000 <br /> <br />