. 1 / <br /> ' ~ Page 9 <br /> <br /> Run Date: 10/11/2005 16:07:47 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No a 004 <br /> Contractor: 2G CONST. Original Contract: $439,927.43 <br /> Job 93-004172 Current Amount: $457,090.08 <br /> Contract No: 2005-00030 Contract Award Date: 05/27/2005 <br /> PO 2005050486 Completion Date: 10/07/2005 <br /> Assessable: Yes <br /> Current Contract Estimated Payment Cumulative Totals t Complete <br /> Line Description Last Chug Ord Unit Price Uait Measure Quantity Amount Quantity Amount Quantity Amount <br /> 1180 TEMP PROTECTN/DIRBCTN $7,836.00 LUMPSUM 1.000 $7,836.00 0.000 $0.00 1.000 $7,836.00 100.00 <br /> 1190 EROSION CONTROL $303.00 LUMPSi7M 1.000 $303.00 0.000 $0.00 1.000 $303.00 100.00 <br /> 1200 10" DRAIN PIPE $37.78 LINPT 30.000 $1,133.40 0.000 $0.00 30.000 $1,133.40 100.00 <br /> 1210 CATCH BASINS $930.OQ EACH 1.000 $930.00 0.000 $0.00 1.000 $930.00 100.00 <br /> 1220 CONNECTION TO EXISTING STRUCT'U $372.00 HACH 1.000 $372.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 1222 RHMOVE CURB INLET 002 $726.39 LUMPSUM 1.000 $726.39 0.000 $0.00 1.000 $726.39 100.00 <br /> 1230 GENERAL EXCAVATION $24.78 CUYD 70.000 $1,734.60 0.000 $0.00 70.000 $1,734.60 100.00 <br /> 1240 SUBGRADE STABILIZATION $13 86 CUYD 35 000 $485 10 0.000 $0.00 0.000 $0.00 0.00 <br /> 1250 SUEGRADfi GEOTCilCTILE $1.03 SQYD 210.000 $216.30 0.000 $0.00 0.000 $0.00 0.00 <br /> 1260 3/4 INCH -0 AGGREGATE BASE SUR $0.79 SQFT 144.000 $113.76 0.000 $0.00 164.000 $129.56 114.00 <br /> 1270 LEVEL 2, 1/2 INCH DENSE HMAC $6.40 SQPT 231.000 $1,478.40 0.000 $0.00 391.000 $2,182.90 146.00 <br /> 1280 PLAIN CONC PVMNT, UNDOWELLED, $5.58 SQFT 1,887.000 $10,529.46 0.000 $0.00 1,834.000 $10,233.72 97.00 <br /> 1290 CONCRfiTE PUMPING $0.29 SQFT 1,887.000 $547.23 0.000 $0.00 0.000 $0.00 0.00 <br /> 1300 1 1/2"-0 AGGREGATE BASE $21.55 CUYD 47.000 $1,012.85 0.000 $0.00 0.000 $0.00 0.00 <br /> 1310 4 INCH CONC WALK $5.60 SQFT 33.000 $184.80 0.000 $0.00 37.000 $207.20 112.00 <br /> 1320 TIE BARS $8.00 EACH 4.000 $32.00 0.000 $0.00 4.000 $32.00 100.00 <br /> 1330 TOPSOIL $4.29 SQPT 10.000 $42.90 0.000 $0.00 62.000 $265.98 620.00 <br /> 1340 SAW CUTTING $1.65 LINFT 190.000 $313.50 0.000 $0.00 152.000 $250.80 80.00 <br /> Alley 31 <br /> 1350 MOBILIZATION $3,653.76 LUMPSUM 1.000 $3,653.76 1.000 $3,653.76 1.000 $3,653.76 100.00 <br /> <br />