Page 6 of 7 <br /> AIRPORT Eu ene Ai ort -Parallel DATE 8/30/05 <br /> Runwa Pro'ect <br /> LOCATION Eugene, Oregon AIP PROJECT NO. 3-41-0018-33/34 <br /> Job No. 4183 <br /> CONTRACTOR Wildish Construction Co. Chan a Order 12 <br /> JUSTIFICATION FOR CHANGE <br /> 2.. Reason(s) for the change(s) (Continue on reverse if necessary) <br /> 2500 - Sawcut asphalt edges at light pads <br /> The original intent was to construct the concrete light pads prior to placing the asphalt, which does not require <br /> edge treatment to the asphalt. It was determined during construction that the asphalt will be placed before the <br /> <br /> pads, thus requiring the asphalt edge to be Sawcut to provide a clean and straight edge to form the concrete to. <br /> 2510 - Excavate soil north of Taxiway Charlie <br /> <br /> The Contractor's original intent was to move this pile through the airport rather than around it on County roads. <br /> Subsequent unrelated work conflicts with the original routing necessitated the Contractor to use the longer route <br /> <br /> around the airport, involving additional time and expense. <br /> <br /> 2520 - Reimbursement for electrical inspection fee <br /> <br /> The City of Eugene paid for this inspection that is included in the Contract with Wildish. <br /> 6 <br /> <br />