• 4 of 7 <br /> AIRPORT Eu ene Ai ort -Parallel DATE 8/30/05 <br /> Runwa Pro'ect <br /> LOCATION Eugene, Oregon AIP PROJECT NO. 3-41-0018-33/34 <br /> Job No. 4183 <br /> CONTRACTOR Wildish Construction Co. Chan a Order 12 <br /> JUSTIFICATION FOR CHANGE <br /> 1. Brief description of the proposed contract change(s) and location(s). <br /> 2510 - Excavate soil north of Taxiway Charlie <br /> The excavated materials shall be hauled around the airport and not on the new taxiways and across runway <br /> 16R/34L. <br /> 2520 - Reimbursement for electrical inspection fee <br /> <br /> Reimburse the airport for the cost of the City inspector to insure that conduit was installed to code. <br /> 4 <br /> <br />