New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4183 CO 9
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4183 CO 9
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2008 4:50:30 PM
Creation date
6/25/2008 10:48:12 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
Yes
External_View
No
GJN
004183
GL_Project_Number
945202
Identification_Number
2004100581
COE_Contract_Number
2004-00024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 of 7 <br /> R 1 3 5 05 <br /> LOCATION Eugene, Oregon AIP PROJECT NO. 3-41-002&33/34 <br /> Job No. 4183 <br /> NTRA TOR Wildi h onstru ti n Co. Chan a Order 9 <br /> JUSTIFICATION FOR CHANGE <br /> ,j Rri~rlear~r+ntinn ~f the <br /> r~na~ri ~nntract rhanop(al <br /> aT ln~atinn ~ql <br /> 2150 - Safety Lnprovements to the Electrical Building <br /> Add Homan box at work bench w/back board -Add an electrical box near the workbench to provide a location <br /> for safely terminating incoming 5 KV cables. <br /> Change wall packs to canopy lights -Replace five wall pack lights with canopy lights to eliminate potential <br /> nesting sites for birds. Include one spare canopy light <br /> Adel 4-way switching in regulator room -Rewire the wall switches in the regulator room so that the lights can <br /> be turned on at each entrance. <br /> Add 4-way switching in control room -Rewire the wall switches in the control room so that the lights can be <br /> turned on at each entrance. <br /> Add a second disconnect at the transformer <br /> 2160 -1tinMional Lnprovements to the Electrical Building <br /> dd a phone jack in the regulator room <br /> Add a phone jack at the work bench <br /> Add a computer receptacle in the control room <br /> Add an outside plug on East side of building <br /> Add water stop brushes to exterior doors (Including new stainless steel door) <br /> Change the ceiling height in Room 102 to 8'-10" -Modify the trusses to increase the ceiling height to 8'-10". <br /> Add three 2-inch conduits under the slab on the East side of the electrical building <br /> Add a junction box on terminate the three 2-inch conduits <br /> Add drawers and a rollout section to the workbench <br /> <br /> 2170 -Improvements to eztend the lifespan of the electrical building <br /> Change door # 103D from mild steel to stainless steel <br /> 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.