|
subtotal: 81,000 128,000 14,200 13,000
<br />
<br /> 5 ~py~~ygy 5,000 5,000
<br /> JIEA Public and Agency Coordination Appendix 2,560 10, 240
<br /> JIEB ProvideAssislarrcetoProjedTeam 768 3,072
<br /> JIEC ProjedTeamMeetkrgs 768 3,072
<br /> JIED Prepare Logistcs for Issue Resolution Conferences 768 3,072
<br /> JIEE CoordiretewithDistrictPudicMaireOfice 768 3,072
<br /> JIEF Support to PlanFamuletion 768 3,072
<br /> contingency-all itemsJl-Publiclnvolvemerd 10,240 18,432
<br /> wbtotel: 18,810 14,032 5,000 5,000
<br /> TOTAL forJl
<br /> Sub4koduct JJ • Plan Fonnulatlon
<br /> 1 JJA Project Man ement end Coordination
<br /> 51,200 102,400 10,OOD iD,000
<br /> 2,560 2,560 2,56D
<br /> subtotal: 63,760 101,980 12,550 10,000
<br /> 2 JJB Plan Formulation Support Tedrwlogy
<br /> JJBB p~ 9,600 9,600 6,000 3,600 5,000 waterways teamin4c
<br /> JJBC Antiysa and Syrdhesdt 16,000 16,000 6,000 10,000 6,000 6,000 stormwaler study bank stabiliz inacind
<br /> JJBD GIS-MaparrdSramrerylnformation 9,600 9,600 9,600
<br /> subtotal: 35,200 35,200 12,000 23,200
<br /> 3 JJC Plan Formulation
<br /> 6,400 12,800 6,400 6,400 bankslabiliz.in-kind
<br /> JJCB BaselinaCorrdi5orrs-F.s~I~fwloProjedCandiSorrs 12,800 25,600 4,000 8,600 3,000 9,625 stamwaterstudy ESEEArralysis
<br /> JJCC Prelirdnary Fortrwlation and Saeerung of Alternatives
<br /> JJCCA Model Development 2,304 4,608 2,304
<br /> 6,336 8,448 6,336 3,000 3,000 stornnvatersludy bankstabil¢.in4dnd
<br /> 6,336 8,448 6,336 3,000 bankslabil¢.in-kind
<br /> JJCCD Identifying Implementation Fremeworks 6,336 8,448 6,336 3,000 3,000 stormwater sWdy bank stabil¢. in4cirxl
<br /> JJCCE Assistance and Meetings 6,336 8,448 2,000 2,000 1,000 1,000 stormwaterstudy bankstabil¢.inkind
<br /> subtotal: 18,818 76,800 27,376 17,136
<br /> JJ~) ,AN1hMIgYIr~o1r01iM~On9nlRrrtli~l~~ep~
<br /> JJCDA AFBProjedDawmmrtation 2,134 4,269
<br /> JJCDB AFB Meetxrg, Logistics 8 Minutes 533 2,131
<br /> JJCDC Poliq Compliance Review 8 Guidance Memaardum
<br /> wbtotal: 2,687 8,100 0 0
<br /> JJCE Firel Fonnulalan of Nlemafives
<br /> JJCEA DevelopWalersl~d-wideProjedFramewak 1,120 11,200 1,120 B,OOD stormwaterstudy
<br /> JJCEB Spedfic Projects at Priority Waterways 11,200 11,200 i 1,20D 4,DOD 6,40D stonrnvater study bank stabil¢. in-kind
<br /> JJCEC Apply Multi-0bjeclive and Cost Metrics 5,040 6,120 5,040 3,000 bank sfabiliz. in-kind
<br /> JJCED Life-Cyde Evaluation Criteria 5,040 6,720 5,040 3,000 l>~fk stabiliz. inacind
<br /> JJCEE Assistance in Final Fomulation 560 2,240
<br /> JJCEF Final Formulation Process -Meetings 6, 720 6, 720
<br /> subtotal: 29,880 M,800 D 22,400
<br /> 4 ~ ~f 14,400 19,200
<br /> 5 ~ WWacl6tNt60n~): 9,600 9,600 9,600
<br /> 6 JJF NWD Approval of Formulator Material
<br /> 7 JJG Quality AssurencelQualityCorrbol 2,400 9,60D
<br /> caMirgency-all itemsJJ-Plan Formulation 15,564 33,120
<br /> wbtofal: N,984 71,520 0 9,600
<br /> TOTAL (orJJ
<br /> Sub•Product JK -Draft Repoli Daurnenta5on
<br /> 1 AKA 'lpttlpllr~lMTtidlniotlfRndhr 10,000 20,000 3,DOD
<br />
<br />
|