subtotal: 81,000 128,000 14,200 13,000 <br /> <br /> 5 ~py~~ygy 5,000 5,000 <br /> JIEA Public and Agency Coordination Appendix 2,560 10, 240 <br /> JIEB ProvideAssislarrcetoProjedTeam 768 3,072 <br /> JIEC ProjedTeamMeetkrgs 768 3,072 <br /> JIED Prepare Logistcs for Issue Resolution Conferences 768 3,072 <br /> JIEE CoordiretewithDistrictPudicMaireOfice 768 3,072 <br /> JIEF Support to PlanFamuletion 768 3,072 <br /> contingency-all itemsJl-Publiclnvolvemerd 10,240 18,432 <br /> wbtotel: 18,810 14,032 5,000 5,000 <br /> TOTAL forJl <br /> Sub4koduct JJ • Plan Fonnulatlon <br /> 1 JJA Project Man ement end Coordination <br /> 51,200 102,400 10,OOD iD,000 <br /> 2,560 2,560 2,56D <br /> subtotal: 63,760 101,980 12,550 10,000 <br /> 2 JJB Plan Formulation Support Tedrwlogy <br /> JJBB p~ 9,600 9,600 6,000 3,600 5,000 waterways teamin4c <br /> JJBC Antiysa and Syrdhesdt 16,000 16,000 6,000 10,000 6,000 6,000 stormwaler study bank stabiliz inacind <br /> JJBD GIS-MaparrdSramrerylnformation 9,600 9,600 9,600 <br /> subtotal: 35,200 35,200 12,000 23,200 <br /> 3 JJC Plan Formulation <br /> 6,400 12,800 6,400 6,400 bankslabiliz.in-kind <br /> JJCB BaselinaCorrdi5orrs-F.s~I~fwloProjedCandiSorrs 12,800 25,600 4,000 8,600 3,000 9,625 stamwaterstudy ESEEArralysis <br /> JJCC Prelirdnary Fortrwlation and Saeerung of Alternatives <br /> JJCCA Model Development 2,304 4,608 2,304 <br /> 6,336 8,448 6,336 3,000 3,000 stornnvatersludy bankstabil¢.in4dnd <br /> 6,336 8,448 6,336 3,000 bankslabil¢.in-kind <br /> JJCCD Identifying Implementation Fremeworks 6,336 8,448 6,336 3,000 3,000 stormwater sWdy bank stabil¢. in4cirxl <br /> JJCCE Assistance and Meetings 6,336 8,448 2,000 2,000 1,000 1,000 stormwaterstudy bankstabil¢.inkind <br /> subtotal: 18,818 76,800 27,376 17,136 <br /> JJ~) ,AN1hMIgYIr~o1r01iM~On9nlRrrtli~l~~ep~ <br /> JJCDA AFBProjedDawmmrtation 2,134 4,269 <br /> JJCDB AFB Meetxrg, Logistics 8 Minutes 533 2,131 <br /> JJCDC Poliq Compliance Review 8 Guidance Memaardum <br /> wbtotal: 2,687 8,100 0 0 <br /> JJCE Firel Fonnulalan of Nlemafives <br /> JJCEA DevelopWalersl~d-wideProjedFramewak 1,120 11,200 1,120 B,OOD stormwaterstudy <br /> JJCEB Spedfic Projects at Priority Waterways 11,200 11,200 i 1,20D 4,DOD 6,40D stonrnvater study bank stabil¢. in-kind <br /> JJCEC Apply Multi-0bjeclive and Cost Metrics 5,040 6,120 5,040 3,000 bank sfabiliz. in-kind <br /> JJCED Life-Cyde Evaluation Criteria 5,040 6,720 5,040 3,000 l>~fk stabiliz. inacind <br /> JJCEE Assistance in Final Fomulation 560 2,240 <br /> JJCEF Final Formulation Process -Meetings 6, 720 6, 720 <br /> subtotal: 29,880 M,800 D 22,400 <br /> 4 ~ ~f 14,400 19,200 <br /> 5 ~ WWacl6tNt60n~): 9,600 9,600 9,600 <br /> 6 JJF NWD Approval of Formulator Material <br /> 7 JJG Quality AssurencelQualityCorrbol 2,400 9,60D <br /> caMirgency-all itemsJJ-Plan Formulation 15,564 33,120 <br /> wbtofal: N,984 71,520 0 9,600 <br /> TOTAL (orJJ <br /> Sub•Product JK -Draft Repoli Daurnenta5on <br /> 1 AKA 'lpttlpllr~lMTtidlniotlfRndhr 10,000 20,000 3,DOD <br /> <br />