|
<br /> 11 JDK Other ErnironmeMel Documents
<br /> aDKA Nh~r(rusggr4nd~n9MYR~96A'
<br /> JOKAA RevrewEwsbrgDataandBeseline 10,080 13,440 10,080 6,800 stormwaterstudy
<br /> JDKAB SedrnaM Sampling Cardamir~rrt Arta '
<br /> ~ 1$440 13,440 6,800 3,200 stormwater study
<br /> AADKAC t194ikft'MMfON11A111~Mg1= + = 7,600 15,000
<br /> JDKB Study Coordkratian end Plan Formulation Activities
<br /> JDKBA Developing Mehks -Ecosystem Outputs 18,900 25,200 18,900 12,500 4,000 riparian acquis. /unds waterways team in-k
<br /> JDKBB Provide Irput into Plan Fomulatan 25,200 50,400 9,153 14,597 14,000 3,400 stormwater study bank stabiliz. io-kind
<br /> JDKBC AssessmentolPrgectAkematives 33,600 67,200 15,D00 19,057 6,250 13,800 riparianacquis.fundswalenwaysPoanksfab.
<br /> JDKBD Ecological Furrc6on 6,300 25,200 2,500 3,250
<br /> Jols~ 9~19+6Dabakptti~x) t2,soo 1s,BOO to,elo s,ooo barrestatafiz.irNcind
<br /> subtotal: 121,720 216,880 46,653 64,694
<br /> TOTALforJD
<br /> Sub-Product JE -Fish and WiIdIHe Coordina9on Act Report
<br /> 1 4,200 16,800 2,000 2,000
<br /> 2'~ Pl6p6radoltoffb9tdrir4laiACtRgp9l1 50,000 50,000
<br /> TOTAL for JE 64,200 66,800 2,000 2,000
<br /> Sub•Produq JF - HTRW StratiodReport
<br /> 1 JFA HTRWPrsGmineryAssessmerdRepart 18,735 24,980 9,350 9,350
<br /> 2 JFB HTRW Site krsPedion Repot 11,241 14,988 11,200
<br /> 3 JFC HTRW Remedial Investigation Study
<br /> 4 JED ~ 33,098 66,197 33,098
<br /> TOTALforJF 63,014 108,166 9,350 b3,1146
<br /> Sub•Product JG • Culture) Resources Report
<br /> 1 JGA Site SurveyFisldRepoA 15,390 20,520 15,OD0
<br /> 2 JGB Date Co6eotian and Analysis Repot 23,085 30, 780 20,000
<br /> 3 JGC MiGgationPlanReport 5,130 20,520
<br /> 4 JGD Memorandum ofRgreemem 9,235 12,312
<br /> 5 d0E A<filhtW9tr~Ifi~solacs?Slu~e/A6p011?
<br /> TOTALforJG 52,840 84,132 0 35,000
<br /> Sub4'raduct JH -Coat EsBmaBng
<br /> 1 JHA Study Cost Estimate Updates 0 0
<br /> 2 JHB PED Coll Estimate 0 0
<br /> 3 JHC Project Cost Estimate
<br /> JHCA PreliminaryCoslEstimates 34,050 68,100 6,500 15,000
<br /> JHCB Feasibility Level Cast Estimates 19,600 39,200 15,000
<br /> 4 JHD OMRRBRCostEstimate 9,825 13,100 6,800
<br /> 5 JHE Baseline Fully Funded Cosl Estimate 14,350 28, 700
<br /> 6 JHF WlOtherCestEstimates 9,825 13,100
<br /> TOTAL forJH 87,860 182,100 6,600 36,8D0
<br /> Sub•ProduN JI - Publlc Invdvement
<br /> 1 JIA Public Meetings
<br /> 1,200 9,600 7,20D ~ 5,000 Publiclnvelveofrcer
<br /> JWB Public Workshops 10,000 Public Irnolve officer
<br /> JIAB,4 Summit Meeting 1: Social, Econanic end Cuhurel CoReats 14,400 19,200 7000
<br /> JIABB SunmitMeeting2SyrNhasisofData 14,400 19,200 7,000
<br /> JIABC Surrnit Meeting 3: Prinaples end Guidelines 14,400 19,200 7,000
<br /> JIAC Study Candusian Public Meeting 7 200 g 6pg I/V
<br /> subtotal: 67,800 78,800 7,200 21,000 V
<br /> 2 JIB DoameMaOanofPublicMeetingsandConmeMS 38,400 16,800 8,000 10,000 ~tI
<br /> 3 JIC RfNkC098r19r01R6p9tt 12,800 25,600 ,1VVV"'
<br /> 4 JID Public Information U
<br /> 3,200 6,400 3,200 2,SD0 PubliclnvolveafFcer
<br /> 9,800 19,200 3,000 3,000 2,5D0 PubliclnvolveafTcer
<br />
<br />
|