Run Date: 63/09/2007 13:03:03 Page 3 <br /> . City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 007 Pinal Pay <br /> Contractor: PEC, INC. Original Contract: $1,155,570.35 <br /> Job 93-004254 Current Amount: <br /> $1,171,130.68 <br /> Contract No: 2005-00024 Contract Award Date: 05/16/2005 <br /> PO 2005050465 Completion Date: 09/15/2005 <br /> Assessable: No <br /> Current Contract Estimated Payment Cumulative Totals 6 Complete <br /> Line Description Last Chug Ord Unit Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0220 TRBE PROTECTION ROOT ZONE EXCA $220.00 EACH 40.000 <br /> $8,800.00 0.000- $0.00 6.000 $1,320.00 16.00 <br /> 0230 CONST. STD. 4"/6" PVC SVC CON $495.00 EACH 210.000 <br /> $103,950.00 0.000 $0 00 190 000 $94 Os0 00 90 00 <br /> 0240 CONST. 4" PVC SADDLE CONN. $605.00 EACH 28.000 <br /> $16,940.00 0.000 $0.00 28.000 $16,940.00 100.00 <br /> 0250 CONST. 6' PVC SADDLE CONN. $630.00 BACH 28.000 <br /> $17,640.00 0.000 $0.00 35.000 $22,050.00 125.00 <br /> 0260 INTERNAL SVC CONNECTION $200.00 EACH 6.000 <br /> $1,200.00 0.000 $0 00 6 000 $1,200 00 loo 00 <br /> 0270 CORE 8" CONC. MAIN $250.00 EACH 11.000 <br /> $2,750.00 0.000 $0.00 10.000 $2,500.00 91.00 <br /> 0280 SEWER PIPE PVC 4"/6• SVC LINE $60.00 LINFT 3,370.000 <br /> $202,200.00 0.000 $0.00 3,455.400 $207,324.00 M 103.00 <br /> 0290 SHNHR PIPB 4"/6• BDPH, PIPH BU $55.00 LINFT 668.000 $36,740.00 0.000 <br /> $0.00 911.000 $50,105.00 136.00 <br /> 0300 SEWER PIPE - SLIP LINE 4•/6" P $33.00 LINFT 120.000 <br /> $3,960.00 0.000 $0.00 109.s00 $3,448.50 87.00 <br /> 0310 GROUT SEAL SVC CONNECTION $800.00 EACH 6.000 $4,800.00 0.000 <br /> $0.00 6.000 $4,800.00 100.00 <br /> 0320 MEi 4•-24" PIPH - 3AN $2,500.00 6ACA 5.000 <br /> $12,500.00 0.000 $0.00 7.000 $17,500.00 140.00 <br /> 0330 MH ADJUST - MINOR - $330.00 EACH 8.000 <br /> $2,640.00 0.000 $0.00 7.000 $2,310.00 88.00 <br /> 0390 MH ADJUST MAJOR $1,200.00 EACH 2.000 <br /> $2,400.00 0.000 $0.00 2.000 $2,400.00 100.00 <br /> 03s0 REM/REPL MH LID W/WTR TIGHT - $725.00 EACH 8.000 <br /> Ss,eoo.oo a o00 $0 00 7 000 $s,o7s ao ea o0 <br /> 0360 REM/REPL SAN MH $3,500.00 EACH 1.000 <br /> $3,500.00 0.000 $0.00 1.000 $3,500.00 100.00 <br /> 0370 MH ABANDON EXIST - SAN $550.00 EACH 7.000 <br /> $3,850.00 0.000 $0.00 8.000 $4,400.00 114.00 <br /> 0380 MH RHMOVB - 3AN $750.00 HACH 1.000 <br /> $750.00 0.000 $0.00 2.000 $1,500.00 200.00 <br /> 0390 FBI 24" RISER - SAN $1,600.00 EACH 1.000 <br /> $1,600.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0400 RECONSTR. EXT DROP $1,600.00 EACH 1.000 <br /> $1,600.00 0.000 $o.oo l.ooo S1,6oo.00 loo.oo <br /> oalo FuI cDT-IN - sAN $sso.oo EACH l.ooo Ssso 00 0 000 $0 00 0 00o So 00 0 00 <br /> 0420 RELEVEL MH BASE $275.00 EACH 1.000 <br /> $275.00 0.000 $0.00 1.000 $275.00 100.00 <br /> <br /> 0430 ABANDON EXIST. PIPE IN PLACE $2.20 LINFT 2,398.000 $5,275.60 0.000 $0.00 1, 7x5.000 $3,861.00 73.00 <br /> <br /> 0440 PLUG INVACTIVE SVC. $600.00 EACH 2.000 $1 000 00 0 000 $0 00 1 000 $500 00 50 00 <br /> <br /> 0450 PLUG PIPE. ENDS $110.00 EACH 19.0 $2,090.00 0.000 _ $0.00 17.000 $1..870.00 89.00 <br /> <br />