Run Date: (~4/09/2007 13:03:03 <br /> City of Eugene Page 2 <br /> • Contract Preliminary Progress Payment <br /> Payment No a 007 Final Pay <br /> Contractor: PEC, INC. <br /> Job 93-004254 Original Contract: $1,155,570.35 <br /> Contract No: 2005-00024 Current Amount: $1,171,130.68 <br /> PO 2005060465 Contract Award Date: 05/16/2005 <br /> Assessable: No Completion Date: 09/15/2005 <br /> Line D_eacrintion Last Chna Ord Current Contract Sst imated Payment Cumulative Totals <br /> Unit Price Unit Measure Quantity Amount ~ Complete <br /> Quantity Amount Quantity Amount <br /> 2005 XABTHNATER RSNABILITATION DF HASIN3 <br /> Oaaeral <br /> 0000 Liquidated Damages ($500.00) DAY <br /> o.ooo So.oo o.ooo $o.oo o.ooo <br /> 0010 MOBILIZATION $0.00 0.00 <br /> $22,500.00 LUMPSUM 1.000 $22,500.00 0.000 <br /> 0020 TEMP PROTECTN DIRECTN $0.00 1.000 $22,500.00 100.00 <br /> $27,500.00 LUMPSUM 1.000 $27,500.00 0.000 <br /> 0030 EROSION CONTROL $0.00 1.000 $27,500.00 100.00 <br /> $2,200.00 LUMPSUM 1.000 $2,200.00 0.000 <br /> 0040 LANDSCAPE $0.00 1.000 $2,200.00 100.00 <br /> $24,200.00 LUMPSUM 1.000 $24,200.00 0.000 <br /> 0050 TV INSPECTION, CLEANING PRE fi $0.00 1.000 $24,200.00 100.00 <br /> $25,000.00 LVMPSUM 1.000 $25,000.00 0.000 <br /> 0060 FLAGGING 50.00 1.000 $25,000.00 100.00 <br /> $60.00 HOUR 150.000 $7,500.00 0.000 <br /> 0070 AC PATCH, ALL DBpT$S $0.00 154.000 $7,700.00 <br /> 103.00 <br /> $165.00 TON 120.000 $19,800.00 0.000 <br /> 0080 TEMP. COLD MIX $0.00 156.990 $25,903.35 131.00 <br /> $2.75 SQPT 2,175.000 $5,981.26 0.000 <br /> 0090 CONCRETE 4" $0.00 1,283.000 $3,528.25 59.00 <br /> $8.76 SQFT 3,200.000 $28,000.00 0.000 <br /> 0100 CONCRETE 5" $0.00 1,849.600 $16,184.00 58.00 <br /> $il.oo sQlrr 2,300.000 $2s,3oo.00 0.000 <br /> 0110 CONCRETE 7" $0.00 1,604.700 $17, 661.70 70.00 <br /> $15.50 SQFT 7,900.000 $122,450.00 0.000 <br /> 0120 SEWER PIPE CIPP 6" $0.00 4,906.100 $76,044.55 M 62.00 <br /> $28.50 LINFT 1,212.000 $34,542.00 0.000 <br /> 0130 SEWER PIPE CIPP 8" $0.00 991.000 $28,243.60 82.00 <br /> $25.50 LINFT 8,399.000 $214,174.50 0.000 <br /> 0140 SEWER PIPE CIPP 10" $0.00 8,400.000 $214,200.00 M 100.00 <br /> $28.00 LINPT 711.000 $19,908.00 0.000 <br /> 0150 SEWER PIPE CIPP 12" $0.00 711.000 $19,908.00 100.00 <br /> $32.00 LINFT 1,347.000 $43,104.00 0.000 <br /> 0160 SEWER PIPE CIPP 15" $0.00 1,347.000 $43,104.00 100.00 <br /> $150.00 LINFT 52.000 $7,800.00 0.000 <br /> 0170 SEWER PIPE PVC 8" $0.00 0.000 $0.00 0.00 <br /> 0180 $55.00 LINPT 335.000 <br /> $18,425.00 0.000 $19,525.00 106.00 <br /> SPOT REPAIR 6" PVC $0.00 355.000 <br /> $165.00 LINFT 66.000 $10,890.00 0.000 <br /> 0190 SPOT RHpAIR 8• PVC $0.00 33.500 $5,527.50 51.00 <br /> $180.00 LINFT 36.000 $6,480.00 0.000 <br /> 0200 SPOT REPAIR 10" PVC $0.00 63.300 $11,394.00 176.00 <br /> $260.00 LZNFT 6.000 $1,500.00 0.000 <br /> <br /> 0210 TREE PRESERVATION FENCING $0.00 4.000 $1,000.00 67.00 <br /> $2.20 LINFT 840-;900- $1,430.00- 0.000 <br /> $0.00 635.400 $1,397.88 98.00 <br /> <br />