New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4258 PBS 04.10.06
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4258 PBS 04.10.06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2010 11:20:51 AM
Creation date
6/20/2008 3:08:58 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Budget Summary
PW_Active
No
External_View
No
GJN
004258
GL_Project_Number
955624
Identification_Number
Revised
Retention_Destruction_Date
7/1/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Run Date: 04/04/2006 11:01:32 City of Eugene <br /> Engineer s Estimate <br /> Estimate: 4258-26th & Hilyard; Cherry City <br /> Job 93-004258 26TH & HILYARD TRAFFIC SIGNALS <br /> Line No. Description Quantity Unit Unit Price Amount <br /> 26TH & HILYARD TRAFFIC SIGNALS <br /> General <br /> 0010. MOBILIZATION 1.00 LUMP SUM $12,795.75 $12,795.75 <br /> 0020. TEMP. WORK ZONE TRAFFIC CONTROL, COMPLETE 1.00 LUMP SUM $14,043.00 $14,043.00 <br /> 0030. FLAGGERS 150.00 HOUR $38.00 $5,700.00 <br /> 0040. EROSION CONTROL 1.00 LUMP SUM $1,447.00 $1,447.00 <br /> 0050. TRUNCATED DOME TEXTURING 90.00 SQFT $39.50 $3,555.00 <br /> 0060. CONCRETE CURBS 269.00 FOOT $22.00 $5,918.00 <br /> 0070. CONCRETE CURB AND GUTTER 6.00 FOOT $72.00 $432.00 <br /> 0080. CONCRETE WALKS 962.00 SQFT $7.00 $6,734.00 <br /> 0090. CONCRETE TRAFFIC SEPARATOR 135.00 LINFT $25.25 $3,408.75 <br /> 0100. PAVEMENT LINE REMOVAL 1.00 LUMPSUM $978.00 $978.00 <br /> 0110. PVMT LEGEND, TYPE Al OR A2: ARROWS 3.00 EACH $110.00 $330.00 <br /> 0120. PVMT LEGEND, TYPE Al OR A2:BUS ONLY 2.00 EACH $403.00 $806.00 <br /> 0130. PVMT LINE, TYPE Al OR A2 288.00 SQFT $5.25 $1,512.00 <br /> 0140. THERMOPLASTIC, NON-PROFILE, 120 MIL, EXTRUDED 1.00 LUMP SUM $2,415.00 $2,415.00 <br /> 0150. REMOVAL OF EXISTING TRAFFIC SIGNALS I.00 LUMP SUM $3,788.00 $3,788.00 <br /> 0160. TRAFFIC SIGNAL INSTALLATION 1.00 LUMP SUM $81,816.00 $81,816.00 <br /> 0170. INTERCONNECT CONDUIT IN HARD SURFACING 170.00 FOOT $17.50 $2,975.00 <br /> 0180. INTERCONNECT CONDUIT IN LANDSCAPED AREAS 205.00 FOOT $17.50 $3,587.50 <br /> Total General $152,241.00 <br /> Total 26TH & HILYARD TRAFFIC SIGNALS $152,241.00 <br /> 26TH & HILYARD TRAFFIC SIGNALS - Othez / Direct <br /> General <br /> 0010. test 1~ of Contract $1,522.41 <br /> 0020. Advertising 1.00 LUMPSUM $500.00 $500.00 <br /> 0030. Contingency 10~ of Contract $15,224.10 <br /> 0040. Printing 1.00 LUMPSUM $1,200.00 $1,200.00 <br /> Total General $18,446.51 <br /> Total 26TH & HILYARD TRAFFIC SIGNALS - Othar / Direct $18,446.51 <br /> 26TH ~ HZLYARD TRAFFIC SIGNAL3 - Miscellaneous 4 <br /> General <br /> 0010. Engineering Charge 32.5 of Direct $55,473.44 <br /> 0020. AS-CONST. 11MONTH WARRANTY CHARGE 1.00 LUMPSUM $788.05 $788.05 <br /> Total General $56,261.49 <br /> Total 26TH & HILYARD TRAFFIC SIGNALS - Miscellaneous $56,261.49 <br /> Total 4258-26th & Hilyard; Cherry City $226,949.00 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.