Public Works <br /> Engineering <br /> City of Eugene <br /> 244 East Broadway <br /> Eugene, Oregon 97401 <br /> (541) 682-5560 <br /> (541) 682-8410 FAX <br /> Memorandum <br /> Date: 11/19/2004 <br /> To: File <br /> From: Matt Rodrigues, Project Manager PWE <br /> Subject: JN 4258- 26th and Hilyard; Traffic Signal Project <br /> This project will include the construction of a signalized intersection at 26th and <br /> Hilyard. The construction of this signalized intersection will provide a direct crossing <br /> <br /> ~r?. route to Amazon Pool for pedestrian traffic. This will facilitate the removal of the <br /> existing mid-block signalized pedestrian crossing 900' south of the 26th and Hilyard <br /> intersection which does not align with the localized pedestrian movement crossing <br /> Hilyard St., a minor arterial, to access the Amazon Pool Facility. Construction of a <br /> signalized intersection will also facilitate improved efficiency in the traffic flow into <br /> and out of the Amazon Pool facilities. <br /> Funding for this project will be 50% TransSDC improvement funds from line item <br /> "Traffic Signal Improvements and Upgrades", and 50% POS Park Bond Monies. The <br /> preliminary estimate is based on funding availability as well as initial estimates from <br /> PWE and the PWM Traffic Operations Department. The budget will be revised as <br /> preliminary design investigation and departmental coordination narrows the scope of <br /> work. <br /> <br />