f'` <br /> R <br /> .CONTINGENCY 10% $19,692.40 <br /> PSF 25% $49,231.0 <br /> TESTING 2% $3,938.48 <br /> Consultant (PSI Soii Test) $1,500.00 <br /> UTILITIES $10,000.00 <br /> <br /> TOTAL PROJECT $281,285.88 <br /> <br />