Exhibit C <br /> Euaene~8-02 Proposal Cost Breakdown Suoolemental Sheet <br /> Cumulative <br /> Quantity Units Rate Subtota/s Total <br /> project Management <br /> Project Engineer 100 m/les S 110.48 ; 1,3 8.00 <br /> Mileage <br /> Per Diem 0.5 days S 100.00 ; 50.00 <br /> ; 1,418.00 S 1,418.00 <br /> klitial Distntss Survey for All Roads <br /> Pro)ect Engineer 15 hours S 110.00 ; 1,650.00 <br /> Mileage 200 miles ; 0.48 ; 96.00 <br /> 1,746.00 S 3,184.00 <br /> NI FVIID Testing Completed Wlth Single Mobilization <br /> Staff Engineer III 6 hours ; 100.00 ; 600.00 <br /> MHeage 180 miles ; 0.48 ; 86.40 <br /> Per Diem 3 days ; 100.00 S 300.00 <br /> S 986.40 S 4,150.40 <br /> /411 Coring Completed With Two Mobilizzdons <br /> Staff Engineer III 12 hours S 97.00 S 1,164.00 <br /> Mileage 250 miles S 0.48 S 120.00 <br /> Per Diem 6 days ; 100.00 ; 600.00 <br /> 1,884.00 i 8,034.40 <br /> 01 Danebo from Barger to Souza 1,487 teat Cores 3 <br /> On Site FWD testing and Coring FWD 40 <br /> FWD Unit (includes staff engineer) 0.3 each S 1,500.00 ; 450.00 <br /> Staff Engineer III (core krgging) 4.5 hours ; 100.00 ; 450.00 <br /> Flagging Subcontractor (includes 12% rt?arkup) 1.0 each S 675.00 S 675.00 <br /> DtNling Subcontractor (includes 12% markup) 0.7 each ; 1.000.00 S 700.00 <br /> Data Reduction and Anaysis <br /> Project Engineer 7.0 hours ; 110.00 S 770.00 <br /> Laboratory Testing <br /> Moisture Content 5.0 each S 12.00 S 60.00 <br /> Wash Sieve Analysis 2.0 each E 80.00 ; 160.00 <br /> Afterberg lJmits 1.0 each S 105.00 S 105.00 <br /> Report Preparatlon <br /> Princlpal Engineer (review) 1.5 hour ; 145.00 S 217.50 <br /> pr,pj~ E~ineer 9.0 hours ; 110.00 E 990.00 <br /> prefdng 4.0 hours ; 81.00 ; 324.00 <br /> Project Assistant 3.0 hours i 70.00 ; 210.00 <br /> Support Staff 1.5 hours E 54.00 ; 81.00 <br /> Subtotal ; 5,192.50 S 11,228.90 <br /> 02 Roosevelt from HWY 99N to Beltline 9.728 feet Cores 14 <br /> t)I1 Slle FWD testlng and Coring FWD 195 <br /> FWD Unit (includes staff engineer) 1.0 each S 1,500.00 S 1,500.00 <br /> Stag Erpineer III (core logging) 17.0 hours ; 100.00 S 1,700.00 <br /> Flagging Subcontractor (includes 12% markup) 2.5 each S 675.00 ; 1,687.50 <br /> Drilling Subcontractor (includes 12% markup) 2.0 each E 1,000.00 ; 2,000.00 <br /> Data Reduction and Anatysls <br /> Project Engineer 15.0 hours ; 110.00 S 1,650.00 <br /> Lat~oratory Testing <br /> Moisture Content 16.0 each ; 12.00 S 192.00 <br /> Wash Steve Analysis 5.0 each ; 80.00 S 400.00 <br /> Atletberg tJlnlts 3.0 each E 105.00 ; 315.00 <br /> Repon Preparation <br /> Principal Engineer (review) 2.5 hour ; 145.00 S 362.50 <br /> Project Engineer 16.0 hours ; 110.00 S 1,760.00 <br /> Drafting 7.0 hours S 81.00 ; 567.00 <br /> Project Assistant 4.0 Flours S 70.00 ; 280.00 <br /> Support Staff 2.0 hours ; 54.00 ; 108.00 <br /> Subtotal ; 12,522.00 ; 23,748.90 <br /> _ <br /> <br /> riTJ~~1~......., , F,~---- a ^rm~eos <br /> <br />