New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4293 GeoDesign Contract 2005-00231
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4293 GeoDesign Contract 2005-00231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 1:06:11 PM
Creation date
6/19/2008 3:49:09 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Contracts
PW_Active
No
External_View
No
GJN
004293
GL_Project_Number
955584
Identification_Number
20061000021
COE_Contract_Number
2005-00231
Retention_Destruction_Date
10/24/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PERSONAL SERVICES CONTRACT <br /> Architect and Engineer <br /> BETWEEN: The City of Eugene, an Oregon <br /> Municipal Corporation <br /> AND: GeoDesign, Inc. <br /> Contract No.: 2005-00231 <br /> This contract is being established per the terms and conditions of Personal Services <br /> Master Contract master contract 2004-00228 dated February 17, 2004, between the <br /> City of Eugene (City) and GeoDesign, Inc. (Contractor). <br /> City and Contractor mutually agree to the attached scope of work as outlined herein and <br /> the contract referenced above as follows: <br /> City of Eugene PPP 2007 Various Sites: Provide pavement testing and design <br /> services, as described in the proposal, for Group 2, which includes the following <br /> streets: <br /> DANEBO FROM BARGER TO SOUZA <br /> ROOSEVELT FROM HWY 99N TO BELTLINE <br /> GOODPASTURE ISLAND ROAD FROM BRIDGE OVER SLOUGH TO <br /> KINGSLEY RD <br /> GOODPASTURE ISLAND ROAD FROM NORKENZIE RD TO RIDGEWAY DR <br /> (WEST) <br /> SENECA FROM ROOSEVELT TO 7T" <br /> RIVER AVE FROM APPROXIMATELY 100 FEET EAST OF RIVER ROAD TO <br /> APPROXIMATELY 362 FEET EAST OF RIVER RD <br /> This project is not to exceed $47,583.15. and the completion date is September <br /> 30,2006. <br /> For Clarification, see Scope of Work attached. <br /> All other terms and conditions of master contract #2004-00228 apply to this scope of <br /> work and remain in full force and effect. <br /> CITY OF EUGENE CONT TOR <br /> <br /> ~~~Ku Core , P.E. <br /> Y Gorge unders, P.E. <br /> ublic Works Director Principa Geotechnical Engineer <br /> Date: ~ • Z ~ -05 Date: ~ (o ~ dao 6 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.