New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
PAF4307
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
PAF4307
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2008 11:37:38 AM
Creation date
6/19/2008 2:11:43 PM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Project Authorization
PW_Active
Yes
External_View
No
GJN
004307
GL_Project_Number
935292
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HAMLIN Peggy D <br /> From: MEDARY Sarah J <br /> gent: Friday, January 28, 2005 9:43 AM <br /> o: HAMLIN Peggy D <br /> Cc; RISDAL Lacey L; MEDLIN Johnny R <br /> Subject: FW: Tugman and Sladden Park Wiring Upgrades <br /> Peggy, we're putting together an sb 2 package for this, however, if we are not successful we will pull the remainder from <br /> the!, a-6 capital accounts, we can have further discussion about which line item on the phone if you give me a call. <br /> Cohsider the work authorized as we sort out the details, this is a high priority for us. Thanks, sm <br /> ----+Original Message----- <br /> Fram: MEDLIN Johnny R <br /> Se~ht: Wednesday, January 26, 2005 11:14 AM <br /> To:' MEDARY Sarah J; RISDAL Lacey L <br /> Cc: COREY Kurt A <br /> Subject: FW: Tugman and Sladden Park Wiring Upgrades <br /> I think we should prepare and pass to Kurt a SB#2 item for life safety emergency repairs. I would make the amount <br /> $75,000 of general fund to cath approximately $15,000 for the work at Skinners Butte part on the same topic. <br /> If vine are told no -then we will need to juggle the capital monies sufficiently to make it work. <br /> Sarah, please be sure to authorize the work to start anyway and don't wait for SB action. The work has to be done in either <br /> funding scenario. <br /> hanks <br /> ohinny <br /> ----?Original Message----- <br /> From: NABETA Ned B <br /> To: MEDLIN Johnny R <br /> Cc: PENWELL Michael J <br /> Serlt: 1/26/2005 10:17 AM <br /> Subbject: Tugman and Sladden Park Wiring Upgrades <br /> Johnny, <br /> I pUt together a cost estimate for upgrading the electrical system at Tugman and Sladden Parks. I am estimating the total <br /> project cost to be around $60,000. This includes engineering fees, installation, project management, and a few <br /> misicellaneous costs. <br /> The scope of the work includes the following: <br /> Sladden Park: Upgrade the service from a 60 amps to a 100 amps. Move meter to the building. Install new conduit from <br /> EW,EB pole to the building and to all of the light poles. Pull new conductors. Provide individual grounds for each pole. All <br /> conduit will be bored (no trenching). <br /> Tugman Park: Install new conduit from service pole to building and at all locations where direct burial cable exist. Pull <br /> nevv conductors at these locations. Provide individual grounds for each pole. All conduit will be bored (no trenching). <br /> If y©u need the estimate broken down, use $20,000 for Tugman and $40,000 for Sladden. <br /> <br /> ~.~anks.....Ned <br /> 1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.