mate: 03/29/2005 14:36:47 <br /> City of Eugene Page 1 <br /> Bid Tabulation <br /> Bid 2005-000004 <br /> Job No. 93-004296 <br /> Column/Row: 1/1 <br /> Line No. Description ENGINEER'S ESTIMATE <br /> Quantity Unit Unit Price Amount <br /> AIRPORT 2005 REHAB BAGGAGE AREA, NORTH RAMP - Contract <br /> General <br /> 0010. MOBILIZATION 1 LUMPSUM $40,000.00 <br /> 0020. EROSION CONTROL $40,000.00 <br /> 0030. Airport Safety & Security 1 LUMPSUM $1,000.00 $1,000.00 <br /> 0040. Te 1 LUMPSUM $5,000.00 <br /> mporary Striping $5,000.00 <br /> 0050. EXCAVATION, UNCLASSIFIED 1141 LINFT $2.50 $2,852.50 <br /> 0060. Geotextile Fabric 1051 CUYD $18.00 $18,918.00 <br /> 0070. CR 14" DEPTH 1870 SQYD $1.00 $1,870.00 <br /> 0080. CR 16" DEPTH 1075 SQYD $12.00 $12,900.00 <br /> 0090. Cold Plane Removal 795 SQYD $14.00 $11,130.00 <br /> 0100. AC, VARIOUS DEPTHS 9943 SQYD $2.80 $27,840.40 <br /> 0110. Adjust Storm Structures 2500 TON $38.00 $95,000.00 <br /> 0120. Shoulder F111 & Grading 2 EACH $700.00 $1,400.00 <br /> 0130. Permanent Striping & Marking 20 TON $100.00 $2,000.00 <br /> 0140. Adjust Taxiway Edge lights 1700 SQFT $1.00 $1,700.00 <br /> 0150. Recessed Retro-Reflective Markers 2 $800.00 $1,600.00 <br /> 0160. SEAL, CRACK SEAL 6 $100.00 $600.00 <br /> 500 LINFT $2.00 $1,000.00 <br /> Total General <br /> <br /> Total AIRPORT 2005 REHAB BAGGAGE AREA, NORTH RAMP - Contract S224,810.90 <br /> $224,810.90 <br /> r <br /> . ~ - <br /> <br />