New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4310 2G PMT 2
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4310 2G PMT 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 1:13:43 PM
Creation date
6/19/2008 11:24:36 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
004310
GL_Project_Number
955684
Identification_Number
2005100465
COE_Contract_Number
2005-00029
Retention_Destruction_Date
10/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Run Date: 08/10/2005 11:36:44 Page 5 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No s 002 <br /> Contractor: 2G CONST. . Original Contract: $370,333.81 <br /> Job 93-004310 Current Amount: $374,047.98 <br /> Contract No: 2005-00029 Contract Award Date: 05/23/2005 <br /> PO 2005050488 Completion Date: 10/05/2005 , <br /> Assessable: Yes <br /> Current Contract Estimated Payment Cumulative Totals 8 Complete <br /> Line Description Last Chng Ord Unit Price Uait Measure Quantity Amount Quantity Amount Quantity Amount <br /> 0520 1 1/2"-0 AGGREGATE BASE $18 04 CUYD 110.000 $1 984.40 0.000 $0.00 0.000 $0.00_ _ _ 0.00 <br /> 0530 LEVEL 2, 1/2 INCH DENSE HMAC $10.14 SQFT 98.000 $993.72 0.000 $0.00 0.000 $0.00 0.00 <br /> 0540 PLAIN CONC PVMNT, UNDOWELLED, $5.57 SQFT 4,970.000 $27,682.90 0.000 $0.00 0.000 $0.00 0.00 <br /> 0550 CONCRETE PUMPING $0 15 S FT 4 970 000 $745.50 0.000 $0.00 0.000 $0.00 0.00 <br /> 0560 TOPSOIL $6.77 SQFT 15.000 $101.55 0.000 $0.00 '0.000 $0.00 0.00 <br /> 0570 TIE BARS $5.10 EACH 14.000 $71.40 0.000 $0.00 0.000 $0.00 0.00 <br /> 0580 SAW CUTTING $2 64 LINFT 117 000 $308.88 74.000 $195.36 74.000 $195.36 63.00 <br /> Alley #20 <br /> 0590 MOBILIZATION $5,283.49 LUMPSUM 1.000 $5,283.49 1.000 $5,283.49 1.000 $5,283.49 100.00 <br /> 0600 TEMP PROTECTN/DIRECTN $1,975.00 LUMPSUM 1.000 $1,975.00 0.300 $592.50 0.300 $592.50 30.00 <br /> 0610 TREE PROTECTION FENCSNG $5.97 LINPT 15.000 $89.55 0.000 _ $0.00 0.000 $0.00 0.00 <br /> 0620 EROSION CONTROL $303.00 LUMPSUM 1.000 $303.00 •0.300 $90.90 0.300 $90.90 30.00 <br /> 0630 10" DRAIN PIPE $28.50 LINFT 183.000 $5,215-50 183.000 $5,215.50 183.000 $5,215.50 100.00 <br /> 0640 MINOR ADJUSTMENT OF MANHOLES $207 00 EACH 1.000 $207.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0650 CATCH BASINS $981.00 EACH 5.000 $4,905.00 4.000 $3,924.00 4.000 $3,924.00 80.00 <br /> 0660 GENERAL EXCAVATION $24.28 CUYD 190.000 $4,613.20 0.000 $0.00 0.000 $0.00 0.00 <br /> 0670 SUHGRADE STABILIZATION $16.14 CUYD 95.000 $1 533.30 0.000 $0.00 0.000 $0.00 0.00 <br /> 0680 SUBGRADE GEOTEXTILE $1.03 SQYD 560.000 $576.80 0.000 $0.00 0.000 $0.00 0.00 <br /> 0690 3/4 INCH-0 AGGREGATE BASE SURF $0.57 SQFT 401.000 $228.57 0.000 $0.00 0.000 $0.00 0.00 <br /> 0700 1 1/2 0 AGGREGATE BASE $18 04 CUYD 110 000 $1 984.40 0.000 $0.00 0.000 $0.00 0.00 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.