j <br /> Run Date: 08/10/2005 11:36:44 page 6 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 002 <br /> Contractor: 2G CONST. Original Contract: $370,333.81 <br /> Job 93-004310 Current Amount: <br /> Contract No: 2005-00029 $374,047.98 <br /> Contract Award Date: 05/23/2005 <br /> PO 2005050488 Completion Date: 10/05/2005 <br /> Assessable: Yes <br /> Current Contract fiatimated Payment Cumulative Totals B Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quantity Amount antit Amount <br /> 0710 LEVEL 2, 1/2 INCH DENSE HMAC $6.31 SQFT 226.000 $1,426.06 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0720 PLAIN CONC PVMNT, UNDOWELLED, $5.51 SQFT 5,038.000 $27,759.38 0.000 $0.00 0.000 <br /> $0.00 0.00 <br /> 0730 CONCRETE PUMPING $0.14 SQFT 5 514 000 $771 96 0 000 $0 00 0 000 $0 00 0 00 <br /> 0740 5 INCH CONC SURFACING $3.10 SQFT 476.000 <br /> $1,475.60 0.000 $0.00 0.000 $0.00 0.00 <br /> 0750 SAW CUTTING $2.64 LINFT 397.000 <br /> $1,048.08 108.000 $285.12 108.000 $285.12 27.00 <br /> 0760 TOPSOIL $6.77 S FT 40 000 <br /> $270 BO 0 000 $0 00 0 000 $0 00 0 00 <br /> 0770 TIE BARS $6.49 EACH 10.000 $64.90 0.000 $0.00 0.000 $0.00 0.00 <br /> 0780 DIGOUT PAVING $4.08 SQFT 24.000 $97.92 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> Alley #21 <br /> 0790 MOBILIZATION $2 546.23 LUMPSUM 1.000 <br /> $2 546 23 0 000 $0 00 0 000 $0 00 0 00 <br /> 0800 TEMP PROTECTN/DIRECTN $1,975.00 LUMPSt1M 1.000 $1,975.00 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 0810 TREE PROTECTION FENCING $5.17 LINFT 20.000 $103.40 0.000 $0.00 0.000 $0.00 0.00 <br /> 0820 fiROSION CONTROL $303.00 LUMPSUM 1.000 <br /> $303 00 0 000 $0 00 0 000 $0 00 0 00 <br /> 0830 10" DRAIN PIPE $38.75 LINFT 25.000 <br /> $968.75 0.000 $0.00 0.000 $0.00 0.00 <br /> 0840 CATCH BASINS $1,155.00 EACH 2.000 <br /> $2,310.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0850 GENERAL EXCAVATION • <br /> 24.46 CUYD <br /> S loo.ooo Sz,aas.oo o.ooo $o.oo o.ooo $o.o0 0 00 <br /> 0860 SUBGRADE STABILIZATION $13.86 CUYD 47.000 $651.42 0.000 $0.00 0.000 $0.00 0.00 <br /> <br /> 0870 SUBGRADE GEOTEXTILE $1.03 SQYD 270.000 $278.10 0.000 $0.00 0.000 $0.00 0.00 <br /> <br /> 0800 3/4 ZNCH-0 AGGREGATE BASE SURF $1.47 SQFT 255.000 $374 85 0 000 $0 00 0 000 $0 00 0 00 <br /> <br /> 0890 1 1/2"-0 AGGREGATE BASE $18.04 CUYD 53.000 $956.12 0.000 $0.00 0.000 $0.00 0.00 <br /> <br />