Run Date: 08/10/2005 11:36:44 Page 8 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 002 <br /> Contractor: 2G CONST. Original Contract: $370,333.81 <br /> Job 93-004310 Current Amount: $374,047.98 <br /> Contract No: 2005-00029 Contract Award Date: 05/23/2005 <br /> PO 2005050488 Completion Date: 10/05/2005 <br /> Assessable: Yea <br /> Current Contract Estimated Payment Cumulative Totals 8 Complete <br /> Line Description Last Chnq Ord Uait Price Unit Measure Quantity Amount Quantity Amount Quantity Amount <br /> 1090 GENERAL EXCAVATION $23.14 CUYD 181.000 <br /> $4,188.34 0.000 $0.00 0.000 $0.00 0.00 <br /> 1100 SUBGRADE STABILIZATION $20.43 CUYD 95.000 <br /> $1,940.85 0.000 $0.00 0.000 $0.00 0.00 <br /> 1110 SUBGRADE GEOTEXTILE $1.03 SQYD 585.000 <br /> $602.55 0.000 $0.00 0.000 $0.00 0.00 <br /> 1120 3/4 INCH-0 AGGREGATE_BASE SURF $1.00 SQFT 225 000 <br /> $225 00 0 000 $0 00 0 000 $0 00 0 00 <br /> 1130 1 1/2"-0 AGGREGATE BASE $18.04 CUYD 114.000 $2,056.56 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 1140 LEVEL 2, 1/2 INCH DENSE HMAC $5.57 SQFT 684.000 <br /> $3,809.88 0.000 $0.00 0.000 $0.00 0.00 <br /> 1150 PLAIN CONC PVMNT, UNDOWELLED, $5.52 SQFT 5 263 000 <br /> $29 051 76 0 000 $0 00 0 000 $0 00 0 00 <br /> 1160 CONCRETE PUMPING $0.14 SQFT 5,581.000 <br /> $781.34 0.000 $0.00 0.000 $0.00 0.00 <br /> 1170 5 INCH CONC SURFACING $3.09 SQFT 318.000 <br /> $982.62 0.000 $0.00 0.000 $0.00 0.00 <br /> 1180 TOPSOIL $6.77 S FT 79 000 $534 83 0 000 <br /> $0 00 0 000 $0 00 0 00 <br /> 1190 TZE BARS $6.49 EACH 93.000 $603.57 0.000 <br /> $0.00 0.000 $0.00 0.00 <br /> 1200 SAW CUTTING $2.64 LINFT 548.000 <br /> $1,446.72 0.000 $0.00 0.000 $0.00 0.00 <br /> 1210 HEDGE REMOVAL $187.00 LUMPSUM 1.000 f <br /> - $187 00 0 000 $0 00 0 000 $0 00 0 00 <br /> 1220 RETAINING WALL $537.00 LUMPSUM 1.000 <br /> $537.00 0.000 $0.00 0.000 $0.00 0.00 <br /> <br /> Alley #29 <br /> 1230 MOBILIZATION $1,760.08 LVMPSUM 1.000 <br /> $1,76o.oe 0.000 $o.oo 0.000 $o.oo o.oo <br /> 1240 TEMP PROTECTN/DIRECTN $1,975.00 LUMPSUM 1.000 <br /> $1,975.00 1.000 $1,975.00 1.000 $1 975.00 100.00 <br /> <br /> 1250 EROSION CONTROL $303.00 LUMPSUM 1.000 <br /> $303.00 1.000 $303.00 1.000 $303.00 100.00 <br /> <br /> 1260 10" DRAIN PIPE $33.83 LINFT 28.000 $947.24 28.000 $947.24 28.000 $947.24 100.00 <br /> <br /> 1270 CATCH BASINS $1, 140.00 EACH 1.000 <br /> $1 140 00 1 000 $1,140 00 1 000 $1,140 00 100 00 <br /> . <br /> <br />