New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN4310 2G PMT 2
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN4310 2G PMT 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2011 1:13:43 PM
Creation date
6/19/2008 11:24:36 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Invoices-Payments & Receivables
PW_Active
No
External_View
No
GJN
004310
GL_Project_Number
955684
Identification_Number
2005100465
COE_Contract_Number
2005-00029
Retention_Destruction_Date
10/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Run Date: 08/10/2005 11:36:44 Page 9 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 002 <br /> Contractor: 2G CONST. Original Contract: $370,333.81 <br /> Job 93-004310 Current Amount: $374,047.98 <br /> Contract No: 2005-00029 Contract Award Date: 05/23/2005 <br /> PO 2005050488 Canpletion Date: 10/05/2005 <br /> Assessable: Yes <br /> Current Contract Estimated Payment Cumulative Totals $ Complete <br /> Line Description Last Chng Ord Unit Price Unit Measure Quantity Amount Quaat ity Amount Quantity Amount <br /> 1280 CONNECTION TO EXISTING STRUCTU $248.00 EACH 1.000 $248.00 1.000 $248.00 1.000 $248.00 100.00 <br /> 1290 GSNSRAL S%CAVATION $23.68 CUYD 55.000 $1,302.40 88.200 $2,088.58 88.200 $2,088.58 160.00 <br /> 1300 SUBGRADE STABILIZATION $13 86 CVYD 32.000 $443.52 0.000 $0.00 0.000 $0.00 _ 0.00 <br /> 1310 SUBGRADE GEOTEXTILE $1.03 SQYD 184.000 $189.52 171.000 $176.13 171.000 $176.13 93.00 <br /> 1320 PLAIN CONC PVMNT, UNDOWELLED, $5.58 SQPT 1,653.000 $9,223.74 1,539.500 $8,590.41 1,539.500 $8,590.41 93.00 <br /> 1330 CONCRETE PUMPING $0 31 SQFT 1 768 000 $548.08 0.000 $0.00 0.000 $0.00 0.00 <br /> 1340 1 1/2"-0 AGGRSGATS BASS $18.04 COYD 36.000 $649.44 !6.000 $829.8! 46.000 $829.84 128.00 <br /> 1350 5 INCH CONC SURFACING $4.27 SQFT 115.000 $491.05 0.000 $0.00 0.000 $0.00 0.00 <br /> 1360 4 INCH CONC WALK $7.78 SQFT 14.000 $108.92 15.000 $116.70 15.000 $116.70 107.00 <br /> 1370 TOPSOIL $6.77 SQFT 22.000 $148.94 0.000 $0.00 0.000 $0.00 0.00 <br /> 1380 TI8 BARS $14.00 SACN 4.000 $56.00 18.000 $252.00 18.000 5252.00 450.00 <br /> 1390 SAW CUTTING $2 64 LINFT ~ 150 000 $396.00 32.000 $84.48 32.000 $84.48 __21.00 <br /> Alley #32 <br /> 1400 MOBILIZATION $2,500.24 LUMPSUM 1.000 $2,500.24 1.000 $2,500.24 1.000 $2,500.24 100.00 <br /> 1410 TEMP PROTECTN/DIRECTN $1,975.00 LUMPSUM 1.000 $1,975.00 0.300 $592.50 0.300 $592.50 30.00 <br /> 1420 EROSION CONTROL $303 00 LUMPSUM 1.000 $303.00 0.300 $90.90 0.300 $90.90 _ _ _ 30.00 <br /> 1430 10" DRAIN PIPE $33.86 LZNFT 28.000 $948.08 28.000 $948.08 28.000 $948.08 100.00 <br /> 1440 ADJUST CLEANOUT $152.00 EACH 1.000 $152.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 1450 MINOR ADJUSTMENT OF MANHOLES $207.00 EACH 1.000 $207.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 1460 CATCH BASINS $1,027.00 EACH 2.000 $2,054.00 1.600 $1,643.20 1.600 $1,643.20 80.00 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.