Run Date: 07/08/2005 11:49:53 <br /> City of Eugene Page 2 <br /> Contract Preliminary Progress Payment <br /> Payment No 001 <br /> Contractor: BROWN CONT. <br /> Job 93-004309 Original Contract: $310,294.00 <br /> Contract No: 2005-00028 Current Amount: $310,294.00 <br /> PO 2005050487 ~ Contract Award Date: Os/23/2005 <br /> Assessable: Yes Completion Date: 10/07/2005 <br /> Line Description Last Chn Ord Current Contract Hst imated Payment <br /> 2_ Unit Price Unit Measure _ Quantity Amount Cumulative Totals t Complete <br /> Quantity Amount Quantity Amount <br /> WHET UNIVERSITY ALLEYS 4, 9, 14, 24, 26, 27, 4 30 <br /> Alley #4 <br /> 0000 Liquidated Damages Phase 1 ($180.00) DAY <br /> 0.000 <br /> 0000 Liquidated Damages Phase 2 $0.00 0.000 $0.00 0.000 $0.00 0.00 <br /> ($100.00) DAY 0.000 $0.00 0.000 <br /> 0000 Li idated Dams es Phase 3 $0.00 0.000 $0.00 0.00 <br /> ($220.00) DAY 0.000 0.00 0.000 <br /> 0010 MOBILIZATION $0.00 0.000 $0.00 0.00 <br /> $3,500.00 LUMPSUM 1.000 $3,500.00 1.000 <br /> 0020 TEMP PROTECTN/DIRSCTN $3,500.00 1.000 $3,500.00 100.00 <br /> $1,980.00 LUMPSUM 1.000 $1,950.00 0.900 <br /> 0030 TRHfi PROTECTION FENCING $1,752.00 0.900 $1,782.00 90.00 <br /> $3.50 LINFT 25.000 $87.50 0.000 <br /> 0040 EROSION CONTROL $0.00 0.000 $0.00 0.00 <br /> $325.00 LUMPSUM 1.000 $325.00 0.900 <br /> OOSO 10" DRAIN PIPE $292.50 0.900 $292.50 90.00 <br /> $54.00 LINFT 28.000 $1,512.00 30.300 <br /> 0060 CATCB BASINS $1,636.20 30.300 $1,636.20 108.00 <br /> $1,300.00 EACH 2.000 2,600.00 2.000 <br /> 0070 CONNHCTION TO EXISTING PIPE $2,600.00 2.000 $2,600.00 100.00 <br /> $250.00 EACH 1.000 $250.00 1.000 <br /> 0080 GHNERAL EXCAVATION $250.00 1.000 $250.00 100.00 <br /> $30.00 CUYD 85.000 $2,550.00 60.700 <br /> 0090 SUHGRADS STABILIZATION $1,821.00 60.700 $1,821.00 71.00 <br /> $50.00 CUYD 43.000 $2,150.00 0.000 <br /> 0100 SUBGRADE GEOTHXTILE $0.00 0.000 0.00 0.00 <br /> $1.00 SQYD 260.000 $260.00 0.000 <br /> 0110 LHVEL 2, 1/2 INCH DBNSfi HMAC $0.00 0.000 $0.00 0.00 <br /> $5.00 SQPT 290.000 $1,450.00 212.700 <br /> 0120 PLAIN CONC PVMNT, $1, 063.60 212.700 73.00 <br /> UNDOWELLED, $1,063.60 <br /> $4.00 S FT 2,324.000 $9,296.00 2,371.600 <br /> 0130 CONCRETH PUMPING $9,486.40 2 371.600 $9,486.40 102.00 <br /> $0.20 SQFT 2,324.000 $464.80 0.000 <br /> 0140 1 1/2"-0 AGGRHGATH HASS $0.00 0.000 $0.00 0.00 <br /> $20.00 CUYD 43.000 $860.00 0.000 <br /> <br /> 0150 4 INCB CONC NALR $0.00 0.000 $0.00 ~ 0.00 <br /> $e.oo sQFT as.ooo <br /> $200.00 39.300 $314.40 39.300 $314.40 <br /> 167.00 <br /> <br />