Run Date: 07/08/2005 11:49:53 Page 3 <br /> City of Eugene <br /> Contract Preliminary Progress Payment <br /> Payment No 001 <br /> Contractor: HROWN CONT. Original Contract: $310,294.00 <br /> Job 93-004309 Current Amount: $310,294.00 <br /> Contract No: 2005-00026 Contract Award Date: 05/23/2005 <br /> PO 2005050487 _ Completion Date: 10/07/2005 <br /> Assessable: Yes <br /> Current Contract Estimated Payment Ctiuaulative Totals ~ Complete <br /> Line Description Last Cbng Ord Unit Price Unit Measure Quantity Amount antit Amount Quantity Amount <br /> 0160 TIE BARS $6.00 EACH 23-000 $138.00 18.000 $108.00 18.000 $108.00 78.00 <br /> 0170 SAWCVTTING $3.00 LINFT 237,000 $711.00 212.000 $636.00 212.000 $636.00 89.00 <br /> Alley #9 <br /> 0180 MOBILIZATION $3,000.00 LUMPSUM 1.000 $3,000.00 1.000 $3,000.00 1.000 $3,000.00 100.00 <br /> 0190 TEMP PROTfiCTN/DIRECTN $1,610.00 LUMPSUM 1.000 $1,610.00 0.900 $1,449-00 0.900 $1,449.00 90.00 <br /> 0200 TREE PROTECTION FENCING $3.50 LINFT 20,000 $70.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0210 EROSION CONTROL $325.00 LUMPSUM 1.000 $325.00 0.900 $292.50 0.900 $292.50 90.00 <br /> 0220 10• DRAIN PIPE $45.00 LINFT 28.000 $1,260.00 59.700 $2,686.50 59.700 $2,686.50 213.00 <br /> 0230 MINOR ADJUSTMENT OF MANHOLES $500.00 fiACH 1.000 $500.00 1.000 $500.00 1.000 $500.00 100.00 <br /> 0240 CATCH BASINS $1,300.00 EACH 2.000 $2,600.00 2.000 $2,600.00 2.000 $2,600.00 100.00 i <br /> 0250 GENERAL HXCAVATION $34.00 CUYD 70.000 $2,380.00 52.500 $1,785.00 52.500 $1,785.00 75.00 <br /> 0260 SUBGRADB STABILIZATION $50.00 CUYD 38.000 $1,900.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0270 SUBGRADB GEOTEXTILE $1.00 SQYD 203.000 $203.00 10.500 $10.50 10.500 $10.50 5.00 <br /> 0280 3/4 INCH-0 AGGREGATE BASfi SURF $4.00 SQFT 93.000 $372.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0290 1 1/2°-0 AGGREGATB BASE $20.00 CVYD 38.000 $760.00 2.400 $48.00 2.900 $48.00 6,00 <br /> 0300 LBVEL 2 1/2 INCH DENSB HMAC $4.00 SQFT 107.000 $426.00 0.000 $0.00 0.000 $0.00 0.00 <br /> 0310 PLAIN CONC PWIIiT, UNDOWBLLfiD, $4.00 SQFT 2,064.000 $6,256.00 2,028.000 $8,112.00 2,028.000 $8,112.00 98.00 <br /> 0320 CONCRHTB PUMPING $0.20 SQFT 2,064.000 $412.80 0.000 $0.00 0.000 $0.00 0.00 <br /> 0330 SAW LOTTING $3.00 L771FT 222.000 $666.00 367.000 $1,101.00 367.000 $1,101.00 165.00 <br /> 0340 TIB BARS $6.00 S?.CH 9.000 $54.00 32.000 $192.00 32.000 $192.00 356.00 <br /> <br /> Alley #14 <br /> <br />